Tyseley Energy from Waste Plant
http://dbpedia.org/resource/Tyseley_Energy_from_Waste_Plant an entity of type: WikicatWastePowerStationsInEngland
Tyseley Energy Recovery Facility is a waste incineration plant in Birmingham, UK. It is run by Veolia. It was built in 1996 by Veolia to a design by Faulks Perry Culley & Rech. The plant has become a notable building in Birmingham with a lighting scheme that illuminates the plant during the hours of darkness. It was built to comply with the European emissions standards that came into force in 1996. Veolia benefits from Levy Exemption Certificates for the element of energy which is produced from renewable sources. This provides income to the City Council. The plant was opposed by Birmingham Friends of the Earth for contributing to climate change, causing air pollution and reducing recycling rates in the city.
rdf:langString
rdf:langString
Tyseley Energy from Waste Plant
xsd:float
52.45980072021484
xsd:float
-1.843899965286255
xsd:integer
11451096
xsd:integer
1092505469
xsd:string
52.4598 -1.8439
rdf:langString
Tyseley Energy Recovery Facility is a waste incineration plant in Birmingham, UK. It is run by Veolia. It was built in 1996 by Veolia to a design by Faulks Perry Culley & Rech. The plant has become a notable building in Birmingham with a lighting scheme that illuminates the plant during the hours of darkness. It was built to comply with the European emissions standards that came into force in 1996. Veolia benefits from Levy Exemption Certificates for the element of energy which is produced from renewable sources. This provides income to the City Council. The plant was opposed by Birmingham Friends of the Earth for contributing to climate change, causing air pollution and reducing recycling rates in the city. The ERF operates 24 hours a day for 365 days a year (except for planned shutdowns for maintenance). It takes around 350,000 tonnes of waste produced by the city annually and burns it to produce electricity, of which 25MW is fed into the National Grid. It is a two-stream plant with each boiler designed to process 23.5 tonnes of rubbish per hour. It has a turbo-generator which exports 25MW to the National Grid, after providing for on-site needs. The ERF also recovers several thousand tonnes a year of ferrous metals for recycling from the process.
xsd:nonNegativeInteger
2569
<Geometry>
POINT(-1.8438999652863 52.459800720215)