Sungai Buloh station

http://dbpedia.org/resource/Sungai_Buloh_station an entity of type: Thing

スンガイ・ブロー駅(スンガイ・ブローえき、マレー語: Stesen Sungai Buloh)はマレーシアセランゴール州にある、マレー鉄道とラピドKLの駅。 rdf:langString
双溪毛糯站(馬來語:Stesen Sungai Buloh)位于马来西亚雪兰莪州双溪毛糯,是电动列车服务、巴生港线和布城线的转乘站(需要出站换乘),曾是加影线第一阶段线路的其中一站,于2016年12月16日开始运营。马来亚铁道公司和马来西亚捷运公司是该车站的主要经营者。 目前两站无法进行站内转换,乘客需要再次购票不同的车票以前往其他车站。 值得注意的是,本站在2021年10月之前是加影线的北端终点站,当布城线在2022年6月16日开通后本站已正式转入布城线系统后,本站不再是加影线的北端终点站。。 rdf:langString
The Sungai Buloh station is an integrated railway station serving the suburb of Sungai Buloh in Selangor, Malaysia, which is located to the northwest of Kuala Lumpur. It is an interchange station, with one section catering to the KTM Komuter Port Klang Line and KTM ETS services, and another section for the MRT Putrajaya Line (formerly the MRT Kajang line). However, there is no paid-area integration between both sections as the two services use different ticketing systems. The newly built integrated station was opened on 16 December 2016 together with the opening of the first phase of the Kajang Line. rdf:langString
rdf:langString スンガイ・ブロー駅
rdf:langString Sungai Buloh station
rdf:langString 双溪毛糯站
rdf:langString Sungai Buloh
rdf:langString Sungai Buloh
xsd:float 3.206111192703247
xsd:float 101.5802764892578
xsd:integer 10752410
xsd:integer 1124758517
rdf:langString Available. 30 bicycle bays.
xsd:gMonthDay --06-16
xsd:integer 1995
rdf:langString The station's signboard after being transferred to Putrajaya Line and the ducky trainset is entering the station from Kampung Batu.
xsd:integer 1892
xsd:date 2016-12-16
xsd:date 2022-06-16
rdf:langString
rdf:langString سوڠاي بولوه
rdf:langString சுங்கை பூலோ
rdf:langString 双溪毛糯
rdf:langString Available with payment. 1236 parking bays, 258 motorcycle bays.
xsd:integer 1
xsd:integer 2016
rdf:langString
rdf:langString Elevated
rdf:langString Surface
rdf:langString Interchange
rdf:langString KTM
xsd:integer 2 4
rdf:langString Commuter rail, Intercity rail and Mass rapid transit station
xsd:string 3.206111111111111 101.58027777777778
rdf:langString The Sungai Buloh station is an integrated railway station serving the suburb of Sungai Buloh in Selangor, Malaysia, which is located to the northwest of Kuala Lumpur. It is an interchange station, with one section catering to the KTM Komuter Port Klang Line and KTM ETS services, and another section for the MRT Putrajaya Line (formerly the MRT Kajang line). However, there is no paid-area integration between both sections as the two services use different ticketing systems. The newly built integrated station was opened on 16 December 2016 together with the opening of the first phase of the Kajang Line. The station was the northern terminus of the Kajang Line until October 2021. The MRT station was closed along with Kampung Selamat and Kwasa Damansara stations until the opening of the Putrajaya line. Their transfer to the Putrajaya line was completed when it began partial operations on June 16, 2022.
rdf:langString スンガイ・ブロー駅(スンガイ・ブローえき、マレー語: Stesen Sungai Buloh)はマレーシアセランゴール州にある、マレー鉄道とラピドKLの駅。
rdf:langString 双溪毛糯站(馬來語:Stesen Sungai Buloh)位于马来西亚雪兰莪州双溪毛糯,是电动列车服务、巴生港线和布城线的转乘站(需要出站换乘),曾是加影线第一阶段线路的其中一站,于2016年12月16日开始运营。马来亚铁道公司和马来西亚捷运公司是该车站的主要经营者。 目前两站无法进行站内转换,乘客需要再次购票不同的车票以前往其他车站。 值得注意的是,本站在2021年10月之前是加影线的北端终点站,当布城线在2022年6月16日开通后本站已正式转入布城线系统后,本站不再是加影线的北端终点站。。
xsd:nonNegativeInteger 23451
rdf:langString Sungai Buloh,Selangor
xsd:string Available. 30 bicycle bays.
xsd:nonNegativeInteger 2 4
xsd:date 2016-12-16
xsd:date 2022-06-16
xsd:gYear 1892 2016 2022
xsd:string Available with payment. 1236 parking bays, 258 motorcycle bays.
xsd:string 1island platform(MRT)
xsd:string 1side platform(KTM)
xsd:gYear 2016
xsd:string Elevated Surface
xsd:gYear 1995
<Geometry> POINT(101.58027648926 3.2061111927032)

data from the linked data cloud