Kolkata Metro Line 6

http://dbpedia.org/resource/Kolkata_Metro_Line_6 an entity of type: Thing

Kolkata Metro Line 6 or the Orange Line of the Kolkata Metro is an under-construction rapid transit line that will connect New Garia with Netaji Subhas Chandra Bose International Airport via two satellite towns Salt Lake and New Town. The line is targeted to open from Kavi Subhash to Hemanta Mukherjee in 2022. This stretch will be one of the most important stretches of metro because it will connect the southern and the eastern parts of the city with Kolkata Airport. Total distance of this route will be 29.87 km (18.56 mi). rdf:langString
rdf:langString Kolkata Metro Line 6
rdf:langString 100px
xsd:integer 100
xsd:integer 51905185
xsd:integer 1122796010
xsd:integer 24
xsd:integer 2012
rdf:langString broad gauge
rdf:langString b82880
xsd:integer 750
rdf:langString Kolkata metropolitan area, India
rdf:langString show
rdf:langString * New Town metro * Airport Metro * Bypass Metro
<kilometrePerHour> 80.0
rdf:langString Under construction
xsd:integer 2
rdf:langString Kolkata Metro Line 6 or the Orange Line of the Kolkata Metro is an under-construction rapid transit line that will connect New Garia with Netaji Subhas Chandra Bose International Airport via two satellite towns Salt Lake and New Town. The line is targeted to open from Kavi Subhash to Hemanta Mukherjee in 2022. This stretch will be one of the most important stretches of metro because it will connect the southern and the eastern parts of the city with Kolkata Airport. Total distance of this route will be 29.87 km (18.56 mi).
rdf:langString
rdf:langString Elevated – 22
rdf:langString Surface – 1
rdf:langString Underground – 1
xsd:integer 500000
rdf:langString * NSCBI Airport * New Garia * New Town
xsd:integer 6
xsd:integer 2022
xsd:double 29870.0
xsd:nonNegativeInteger 24
xsd:double 80.0
xsd:nonNegativeInteger 12998
xsd:string Under construction

data from the linked data cloud