High Speed 2 Phase Two

http://dbpedia.org/resource/High_Speed_2_Phase_Two an entity of type: Thing

High Speed 2 is a planned new high-speed railway line connecting London with the city centres of Birmingham, Manchester and Leeds directly on new high speed track. East Midlands Airport will also be served. The railway is to be delivered in two phases: * Phase 1: linking London and Birmingham. * Phase 2: linking Birmingham with Manchester and Leeds. Phase 2 is planned for completion in 2032–33. Phase two is split into two sub-phases: rdf:langString
rdf:langString High Speed 2 Phase Two
rdf:langString High Speed 2 - Phase Two
rdf:langString High Speed 2 - Phase Two
xsd:integer 38405897
xsd:integer 1105950985
rdf:langString Crewe
rdf:langString Manchester Piccadilly
rdf:langString Leeds New Lane
rdf:langString Leeds spur:
rdf:langString Manchester spur:
rdf:langString Sheffield Meadowhall
rdf:langString Toton Sidings
rdf:langString To be decided
rdf:langString The Phase Two route, highlighted in red, consists of two lines to Manchester and Leeds
rdf:langString July 2016
xsd:integer 25
xsd:integer 270
rdf:langString yes
xsd:integer 2032
rdf:langString Up to
rdf:langString Planning stage
rdf:langString Double track throughout
rdf:langString High-speed railway
rdf:langString High Speed 2 is a planned new high-speed railway line connecting London with the city centres of Birmingham, Manchester and Leeds directly on new high speed track. East Midlands Airport will also be served. The railway is to be delivered in two phases: * Phase 1: linking London and Birmingham. * Phase 2: linking Birmingham with Manchester and Leeds. Phase 2 is planned for completion in 2032–33. Phase two is split into two sub-phases: * Phase 2a: the section from Birmingham to Crewe, which is to be built simultaneously with phase 1, effectively merging with phase 1. * Phase 2b: the remainder of phase 2. The concept of HS2 was that all major cities covered would have a city centre HS2 station. Liverpool, along with London, Birmingham, Manchester and Leeds, was envisaged to have a city centre HS2 station. The scheme was cut down to only three provincial city centres served directly by HS2, two being on phase 2. The preliminary route for Phase Two was announced on 28 January 2013. It is envisaged construction on Phase Two will start in 2022 with completion by 2032.
rdf:langString Golborne
xsd:double 402.335
xsd:nonNegativeInteger 18807
xsd:gYear 2032
xsd:string Planning stage

data from the linked data cloud