Front-end loading

http://dbpedia.org/resource/Front-end_loading an entity of type: Election

Front-end loading (FEL), also referred to as pre-project planning (PPP), front-end engineering design (FEED), feasibility analysis, conceptual planning, programming/schematic design and early project planning, is the process for conceptual development of projects in processing industries such as upstream oil and gas, petrochemical, natural gas refining, extractive metallurgy, waste-to-energy, and pharmaceuticals. This involves developing sufficient strategic information with which owners can address risk and make decisions to commit resources in order to maximize the potential for success. rdf:langString
Front-end engineering design (FEED), ook wel omschreven als pre-project planning (PPP), front-end loading (FEL), feasibility analysis, conceptual planning, programming/schematic design en early project planning, is een manier om in concept-fase projecten binnen de industrie te beschrijven, industrie zoals , petrochemische industrie, aardgaswinning en farmacie. Binnen deze aanpak is het streven om voldoende strategische informatie te verzamelen teneinde een goede risicoanalyse mogelijk te maken; de verantwoordelijke kan dan meer gerichte beslissingen nemen met als doel met zo min mogelijk middelen de kans op een succesvolle productie zo groot mogelijk te maken. rdf:langString
rdf:langString Front-end loading
rdf:langString Front-end engineering design
xsd:integer 12429069
xsd:integer 1109180406
rdf:langString Front-end loading (FEL), also referred to as pre-project planning (PPP), front-end engineering design (FEED), feasibility analysis, conceptual planning, programming/schematic design and early project planning, is the process for conceptual development of projects in processing industries such as upstream oil and gas, petrochemical, natural gas refining, extractive metallurgy, waste-to-energy, and pharmaceuticals. This involves developing sufficient strategic information with which owners can address risk and make decisions to commit resources in order to maximize the potential for success. Front-end loading includes robust planning and design early in a project's lifecycle (i.e., the front end of a project), at a time when the ability to influence changes in design is relatively high and the cost to make those changes is relatively low. It typically applies to industries with highly capital intensive, long lifecycle projects (i.e., hundreds of millions or billions of dollars over several years before any revenue is produced). Though it often adds a small amount of time and cost to the early portion of a project, these costs are minor compared to the alternative of the costs and effort required to make changes at a later stage in the project. It also typically uses a stage-gate process, whereby a project must pass through formal gates at well defined milestones within the project's lifecycle before receiving funding to proceed to the next stage of work. The quality of front-end planning can be improved through the use of (Project Definition Rating Index) as a part of the stage-gate process. Front-end loading is usually followed by detailed design or detailed engineering.
rdf:langString Front-end engineering design (FEED), ook wel omschreven als pre-project planning (PPP), front-end loading (FEL), feasibility analysis, conceptual planning, programming/schematic design en early project planning, is een manier om in concept-fase projecten binnen de industrie te beschrijven, industrie zoals , petrochemische industrie, aardgaswinning en farmacie. Binnen deze aanpak is het streven om voldoende strategische informatie te verzamelen teneinde een goede risicoanalyse mogelijk te maken; de verantwoordelijke kan dan meer gerichte beslissingen nemen met als doel met zo min mogelijk middelen de kans op een succesvolle productie zo groot mogelijk te maken. Front-end engineering design houdt in dat er in een vroeg stadium van een project (lees: de voorzijde/front end van een project) al een - weinig verfijnd - planning en ontwerp gemaakt wordt, daar waar er nog relatief veel veranderd kan worden in het ontwerp zonder dat daaraan direct grote kosten verbonden zijn. Dergelijke aanpak is typisch voor industrie met kapitaalintensieve projecten met een lange lifecycle (doorlooptijd, ), denk daarbij aan investeringen van miljarden of honderd miljoenen gedurende een aantal jaren voordat er maar sprake is van enige winst. Ondanks dat de aanpak relatief gezien duurder is en er meer tijd mee gemoeid is, staan deze meerkosten in geen verhouding tot de kosten die gemaakt moeten worden bij significante veranderingen in het ontwerp in een laat stadium van betreffende project. Het kenmerkt zich ook door peilmomenten, waarbij de voortgang/stadium van het ontwerp binnen een project eerst aan vooraf vastgestelde criteria dient te voldoen willen de betrokkenen starten met de daaropvolgende fase, inclusief de financiering daarvan. Een afgerond FEED-project krijgt doorgaans een vervolg, een project met een meer gedetailleerd ontwerp als doel, bedoeld voor uitvoering door de aannemer(s).