Zone 1 (Manchester Metrolink)

http://dbpedia.org/resource/Zone_1_(Manchester_Metrolink) an entity of type: Thing

Zone 1 of the Manchester Metrolink light rail network is the heart of the system where all of the other lines converge. Its boundaries are broadly equivalent to those of Manchester city centre, and approximately mirror the city's Inner Ring Road. Within Zone 1, first opened in 1992 as the City Zone, trams largely run along semi-pedestrianised streets rather than on their own separate alignment. The original route between the Altrincham and Bury lines ran to Victoria station via Market Street and High Street, and was soon joined by a branch to Piccadilly station by a three-way delta junction. A second route between the South-West and North-Eastern parts of the network was built to ease congestion on the original line. Opened in 2017, the Second City Crossing (2CC) added one additional stop rdf:langString
rdf:langString Zone 1 (Manchester Metrolink)
xsd:integer 52638558
xsd:integer 1091107761
rdf:langString none
rdf:langString The City Zone on opening in 1992.
rdf:langString Geographical map of on-street City Centre tram stops
rdf:langString The Zone in 2017, after the opening of the Second City Crossing.
rdf:langString The Zone in 2013, High Street and Mosley Street have closed, and Shudehill has opened. Market Street has been rebuilt for two-way traffic, G-Mex has been renamed as Deansgate-Castlefield, and the line to Ashton has opened.
rdf:langString horizontal
rdf:langString Manchester Metrolink City Centre Zone map.png
rdf:langString Metrolink Central Zone 1992.png
rdf:langString Metrolink Central Zone 2013.png
rdf:langString Metrolink Central Zone 2017.png
xsd:integer 289 330
rdf:langString Zone 1 of the Manchester Metrolink light rail network is the heart of the system where all of the other lines converge. Its boundaries are broadly equivalent to those of Manchester city centre, and approximately mirror the city's Inner Ring Road. Within Zone 1, first opened in 1992 as the City Zone, trams largely run along semi-pedestrianised streets rather than on their own separate alignment. The original route between the Altrincham and Bury lines ran to Victoria station via Market Street and High Street, and was soon joined by a branch to Piccadilly station by a three-way delta junction. A second route between the South-West and North-Eastern parts of the network was built to ease congestion on the original line. Opened in 2017, the Second City Crossing (2CC) added one additional stop to the network.
xsd:nonNegativeInteger 17782

data from the linked data cloud