William H. Putnam Memorial Bridge
http://dbpedia.org/resource/William_H._Putnam_Memorial_Bridge an entity of type: Thing
The Putnam Bridge is a bridge in the state of Connecticut carrying the Route 3 Expressway over the Connecticut River, connecting Interstate 91 in Wethersfield and Route 2 in Glastonbury. It is the southernmost crossing of the Connecticut River in the Hartford Area and carries an average of 50,800 vehicles per day.[1] In 2013, the bridge underwent a $15 million rehabilitation project, which repaved the roadbed, repainted the girders, added new lighting fixtures and a new pedestrian walkway.
rdf:langString
rdf:langString
William H. Putnam Memorial Bridge
rdf:langString
Putnam Bridge
rdf:langString
William H. Putnam Memorial Bridge
xsd:float
41.71416854858398
xsd:float
-72.64083099365234
xsd:integer
7462670
xsd:integer
1109606634
xsd:integer
50800
rdf:langString
William H. Putnam Memorial Bridge
rdf:langString
Putnam Bridge
xsd:integer
20
rdf:langString
Western end of the William H. Putnam Memorial Bridge, before rehabilitation.
rdf:langString
Expressway
rdf:langString
Steel girder bridge
xsd:integer
20
xsd:integer
20025362
xsd:integer
300
rdf:langString
Wethersfield and Glastonbury.
rdf:langString
William H. Putnam Memorial Bridge
rdf:langString
Crossings
rdf:langString
William H. Putnam Memorial Bridge
xsd:integer
20
xsd:string
41.714166666666664 -72.64083333333333
rdf:langString
The Putnam Bridge is a bridge in the state of Connecticut carrying the Route 3 Expressway over the Connecticut River, connecting Interstate 91 in Wethersfield and Route 2 in Glastonbury. It is the southernmost crossing of the Connecticut River in the Hartford Area and carries an average of 50,800 vehicles per day.[1] The bridge was built in the late 1950s as part of the Route 3 connector between Interstate 91 and Connecticut Route 2. It originally terminated at Main Street in Glastonbury, rather than at Route 2. It was expected to be expanded to a double-decker in the early 1970s as part of the planned Interstate 491, a southeastern bypass around Hartford from Wethersfield to East Hartford. However, the project was cancelled in 1973. In the late 1980s, the expressway portion of Route 3 was extended to terminate at Route 2. In 2013, the bridge underwent a $15 million rehabilitation project, which repaved the roadbed, repainted the girders, added new lighting fixtures and a new pedestrian walkway.
<foot>
80.0
xsd:nonNegativeInteger
3150
xsd:string
Expressway
xsd:nonNegativeInteger
50800
<Geometry>
POINT(-72.640830993652 41.714168548584)