West Coast Highway, Singapore
http://dbpedia.org/resource/West_Coast_Highway,_Singapore an entity of type: Thing
西海岸大路(英語:West Coast Highway,馬來語:Lebuhraya Pantai Barat),是新加坡一條主幹道,將裕廊工業區和金文泰新鎮與市中心連接起來。西海岸大路全長11公里,分為兩個路段,地面路段六線雙程行車,從班丹環道(英語:Pandan Loop)和西海岸路的交匯處開始到(英語:Pasir Panjang Road)的交匯處,之後便連接5公里長的高架橋路段,轉為雙線雙程行車。該高架橋是新加坡最長的高架橋。
rdf:langString
West Coast Highway (Chinese: 西海岸大路; Malay: Lebuhraya Pantai Barat; Tamil: மேற்கு கடற்கரை நெடுஞ்சாலை) is a major arterial road in Singapore which links Jurong industrial estate and Clementi New Town to the city. It is an at-grade road from its junction with Pandan Loop and West Coast Road to its interchange with Pasir Panjang Road, where it becomes a grade-separated viaduct; the viaduct merges with Keppel Road before its interchange with Ayer Rajah Expressway. The total length of the highway is 11 km. The viaduct is newer than the at-grade section, having been completed in 2006.
rdf:langString
rdf:langString
West Coast Highway, Singapore
rdf:langString
西海岸大路
rdf:langString
West Coast Highway
rdf:langString
West Coast Highway
xsd:integer
4650004
xsd:integer
1123039771
rdf:langString
InternetArchiveBot
rdf:langString
SGP
rdf:langString
June 2020
rdf:langString
West
rdf:langString
East
rdf:langString
yes
rdf:langString
At-grade road widened in 2000
rdf:langString
Viaduct opened in 2006
rdf:langString
West Coast Highway is labelled in double yellow line
rdf:langString
Tanjong Pagar
rdf:langString
West Coast Highway (Chinese: 西海岸大路; Malay: Lebuhraya Pantai Barat; Tamil: மேற்கு கடற்கரை நெடுஞ்சாலை) is a major arterial road in Singapore which links Jurong industrial estate and Clementi New Town to the city. It is an at-grade road from its junction with Pandan Loop and West Coast Road to its interchange with Pasir Panjang Road, where it becomes a grade-separated viaduct; the viaduct merges with Keppel Road before its interchange with Ayer Rajah Expressway. The total length of the highway is 11 km. The viaduct is newer than the at-grade section, having been completed in 2006. Despite what its name may suggest, the speed limit on the highway is less than that of an expressway. The highway also has a few traffic light junctions, something that expressways do not have. The at-grade section of the highway is a three-lane dual carriageway, and the viaduct is a two-lane dual carriageway with a 1-metre hard shoulder. At a length of 5 km, the viaduct is the longest in Singapore.
rdf:langString
西海岸大路(英語:West Coast Highway,馬來語:Lebuhraya Pantai Barat),是新加坡一條主幹道,將裕廊工業區和金文泰新鎮與市中心連接起來。西海岸大路全長11公里,分為兩個路段,地面路段六線雙程行車,從班丹環道(英語:Pandan Loop)和西海岸路的交匯處開始到(英語:Pasir Panjang Road)的交匯處,之後便連接5公里長的高架橋路段,轉為雙線雙程行車。該高架橋是新加坡最長的高架橋。
xsd:nonNegativeInteger
9917
xsd:string
East
xsd:string
West