Tung Chung East station
http://dbpedia.org/resource/Tung_Chung_East_station an entity of type: Thing
Tung Chung East (Chinese: 東涌東) is a proposed MTR station on the Tung Chung line to be constructed to the east of Tung Chung, Lantau Island, New Territories, Hong Kong. This station will be at ground level, similar to Sunny Bay station, so as to not affect the existing railway network. It was proposed in the Tung Chung New Town Extension Study, to serve a proposed new 120 hectares (300 acres) of reclaimed land, along with a new Tung Chung West station.
rdf:langString
東涌東站(英語:Tung Chung East Station)是港鐵東涌綫一個已落實興建的車站,鄰近東涌填海區。為了配合原有路軌路段,此站將會設為地面車站。預計於2023年動工,2029年通車。
rdf:langString
rdf:langString
Tung Chung East station
rdf:langString
東涌東站
rdf:langString
Tung Chung East
rdf:langString
Tung Chung East
xsd:float
22.29680061340332
xsd:float
113.9580993652344
xsd:integer
41368731
xsd:integer
1111808635
rdf:langString
Environmental permit approved
rdf:langString
Expected commencement of construction
rdf:langString
Expected completion of construction
rdf:langString
Planning and design commences
rdf:langString
Project gazetted under the Railways Ordinance
rdf:langString
Cheung Tung Road, Tung Chung
rdf:langString
Islands District, Hong Kong
rdf:langString
TCE
rdf:langString
None
rdf:langString
Ground Level
rdf:langString
Proposed location of the station.
xsd:integer
1
rdf:langString
rdf:langString
Hong Kong MTR system map
rdf:langString
Location within the MTR system
rdf:langString
Hong Kong MTR
rdf:langString
東涌東
rdf:langString
yue
rdf:langString
Expected:
xsd:integer
2
rdf:langString
At-grade
rdf:langString
MTR
rdf:langString
mtr
rdf:langString
hk
rdf:langString
rdf:langString
Future MTR rapid transit station
xsd:integer
2020
2021
2022
2023
2030
xsd:string
22.2968 113.9581
rdf:langString
Tung Chung East (Chinese: 東涌東) is a proposed MTR station on the Tung Chung line to be constructed to the east of Tung Chung, Lantau Island, New Territories, Hong Kong. This station will be at ground level, similar to Sunny Bay station, so as to not affect the existing railway network. It was proposed in the Tung Chung New Town Extension Study, to serve a proposed new 120 hectares (300 acres) of reclaimed land, along with a new Tung Chung West station.
rdf:langString
東涌東站(英語:Tung Chung East Station)是港鐵東涌綫一個已落實興建的車站,鄰近東涌填海區。為了配合原有路軌路段,此站將會設為地面車站。預計於2023年動工,2029年通車。
xsd:nonNegativeInteger
4712
rdf:langString
Cheung Tung Road,Tung Chung
xsd:string
TCE
xsd:integer
1
xsd:string
At-grade
<Geometry>
POINT(113.95809936523 22.296800613403)