Tuanku Jaafar Power Station

http://dbpedia.org/resource/Tuanku_Jaafar_Power_Station an entity of type: Thing

Das Kraftwerk Tuanku Jaafar (bzw. Tuanku Ja'afar) ist ein GuD-Kraftwerk in Port Dickson, Bundesstaat Negeri Sembilan, Malaysia, das an der Straße von Malakka gelegen ist. Es wurde nach Tuanku Ja'afar benannt. Das Kraftwerk ist im Besitz der Tenaga Nasional Berhad (TNB) und wird auch von TNB betrieben. rdf:langString
Tuanku Jaafar Power Station is one of the main power stations in Malaysia, located in Port Dickson, Negeri Sembilan. The power station belongs to Tenaga Nasional Berhad and is a state-of-art combined cycle power plants comprise PD1 (750MW MHI Technology) and PD2 (750MW GE-TOSHIBA Technology). PD1 was on commercial loading in 2005 whereas PD2 started in February 2009. Both combined cycle plants are firing natural gas supplied by Petronas with distillate as a stand-by fuel. rdf:langString
rdf:langString Kraftwerk Tuanku Jaafar
rdf:langString Tuanku Jaafar Power Station
rdf:langString Tuanku Jaafar
rdf:langString Tuanku Jaafar
xsd:float 2.532999992370605
xsd:float 101.7911987304688
xsd:integer 4718656
xsd:integer 1123140454
rdf:langString Malaysia
rdf:langString Port Dickson, Negeri Sembilan,
xsd:integer 2005
xsd:string 2.533 101.7912
rdf:langString Das Kraftwerk Tuanku Jaafar (bzw. Tuanku Ja'afar) ist ein GuD-Kraftwerk in Port Dickson, Bundesstaat Negeri Sembilan, Malaysia, das an der Straße von Malakka gelegen ist. Es wurde nach Tuanku Ja'afar benannt. Das Kraftwerk ist im Besitz der Tenaga Nasional Berhad (TNB) und wird auch von TNB betrieben.
rdf:langString Tuanku Jaafar Power Station is one of the main power stations in Malaysia, located in Port Dickson, Negeri Sembilan. The power station belongs to Tenaga Nasional Berhad and is a state-of-art combined cycle power plants comprise PD1 (750MW MHI Technology) and PD2 (750MW GE-TOSHIBA Technology). PD1 was on commercial loading in 2005 whereas PD2 started in February 2009. Both combined cycle plants are firing natural gas supplied by Petronas with distillate as a stand-by fuel. The first phase of Tuanku Jaafar Power Station began in 1969, when it was a conventional thermal power plant (firing fuel-oil) 4 x 60MW units. This was followed in 1978 with 3 x 120MW units. A 25MW Gas Turbine was added for blackstart and peaking purposes. In 2000, the conventional power plant was dismantled in stages to allow for rehabilitation project, which was fully completed in 2009. Tuanku Jaafar Power Station has now become the power plant of choice (top in the merit order) with high efficiency, full automation (Automatic Governor Control-AGC), in compliance to the international standards and environment.
xsd:integer 2004
rdf:langString Yes
xsd:gYear 2004
xsd:nonNegativeInteger 1919
xsd:string 2004
xsd:gYear 2005
<Geometry> POINT(101.79119873047 2.5329999923706)

data from the linked data cloud