The Big Move rapid transit projects

http://dbpedia.org/resource/The_Big_Move_rapid_transit_projects

The Big Move is a regional transportation plan (RTP) published in 2008 and consisting of 62 rapid transit projects to be implemented across the Greater Toronto and Hamilton Area (GTHA). These rapid transit projects are intended to form a seamlessly integrated regional rapid transit network, which is the first priority action in the regional transportation plan. These projects form two long-term templates with 15 and 25 year horizons. These templates outline broad projects; specific details about technology, alignment, stations and service levels for each project are subsequently determined though a cost–benefit analysis or an environmental assessment process. rdf:langString
rdf:langString The Big Move rapid transit projects
xsd:integer 48819835
xsd:integer 1101019564
rdf:langString left
rdf:langString vertical
rdf:langString MiWay and Züm are the bus rapid transit providers for Mississauga and Brampton, respectively.
rdf:langString MiWay 1053 wide crop.jpg
rdf:langString ZumBus.jpg
xsd:integer 200
rdf:langString The Big Move is a regional transportation plan (RTP) published in 2008 and consisting of 62 rapid transit projects to be implemented across the Greater Toronto and Hamilton Area (GTHA). These rapid transit projects are intended to form a seamlessly integrated regional rapid transit network, which is the first priority action in the regional transportation plan. These projects form two long-term templates with 15 and 25 year horizons. These templates outline broad projects; specific details about technology, alignment, stations and service levels for each project are subsequently determined though a cost–benefit analysis or an environmental assessment process.
xsd:nonNegativeInteger 23705

data from the linked data cloud