Tala Bridge

http://dbpedia.org/resource/Tala_Bridge an entity of type: Thing

Tala Setu is a bridge on the Kolkata Circular railway in the state of West Bengal. It connects the Shyambazar area of Kolkata with the Kolkata's northern suburbs. The bridge was opened in 1962, but due to structural weakness of the bridge, demolition work was started by Indian Railways from February 2020. The demolition work was completed by April 2020. The new bridge was opened on 22 September 2022. The total length of the new bridge is 743.43 meters. A total of 468 crore was spent to build the bridge. The bridge was built on a government initiative under the Department of Public Works. rdf:langString
rdf:langString Tala Bridge
rdf:langString Tala Setu
rdf:langString Hemant Setu
xsd:float 22.60871124267578
xsd:float 88.37569427490234
xsd:integer 71824014
xsd:integer 1121914206
rdf:langString No
rdf:langString Tala Setu
rdf:langString * Four lane BT road * Footpaths on both sides for pedestrians
xsd:integer 300
rdf:langString Hemant Setu
xsd:gMonthDay --09-22
xsd:string 22.6087115 88.3756963
rdf:langString Tala Setu is a bridge on the Kolkata Circular railway in the state of West Bengal. It connects the Shyambazar area of Kolkata with the Kolkata's northern suburbs. The bridge was opened in 1962, but due to structural weakness of the bridge, demolition work was started by Indian Railways from February 2020. The demolition work was completed by April 2020. The new bridge was opened on 22 September 2022. The total length of the new bridge is 743.43 meters. A total of 468 crore was spent to build the bridge. The bridge was built on a government initiative under the Department of Public Works.
<kilometre> 0.74343
xsd:nonNegativeInteger 2752
xsd:string * Footpaths on both sides for pedestrians
xsd:string * Four lane BT road
xsd:double 743.4299999999999
xsd:date 2022-09-22
xsd:gYear 1962 2022
xsd:double 24.0
<Geometry> POINT(88.375694274902 22.608711242676)

data from the linked data cloud