Susitna Hydroelectric Project

http://dbpedia.org/resource/Susitna_Hydroelectric_Project an entity of type: Thing

The Susitna Hydroelectric Project (commonly called the Susitna Dam or the Susitna-Watana Dam) was a proposed hydroelectric power project along the Susitna River in southern Alaska. The project, which originally consisted of two dams along the river, was proposed as early as the 1960s by the U.S. Bureau of Reclamation to supply electricity to the railbelt region of Alaska (areas served by the Alaska Railroad), including the cities of Anchorage and Fairbanks. At the time, it was known as the Devil's Canyon Dam, for its location just upstream of Devils Canyon, a 1,000-foot (300 m)-deep gorge and whitewater rapids formed by the Susitna River. When oil prices and state revenue (based on taxes levied on oil extraction) declined, the plan was put on hold. When oil prices rose to then-record highs rdf:langString
rdf:langString Susitna Hydroelectric Project
rdf:langString Susitna Dam (Devil's Canyon Dam)
rdf:langString Susitna Dam
xsd:float 62.82277679443359
xsd:float -148.5486145019531
xsd:integer 21105254
xsd:integer 1079669577
rdf:langString Alaska
rdf:langString Scrapped
xsd:string 62.82277777777778 -148.54861111111111
rdf:langString The Susitna Hydroelectric Project (commonly called the Susitna Dam or the Susitna-Watana Dam) was a proposed hydroelectric power project along the Susitna River in southern Alaska. The project, which originally consisted of two dams along the river, was proposed as early as the 1960s by the U.S. Bureau of Reclamation to supply electricity to the railbelt region of Alaska (areas served by the Alaska Railroad), including the cities of Anchorage and Fairbanks. At the time, it was known as the Devil's Canyon Dam, for its location just upstream of Devils Canyon, a 1,000-foot (300 m)-deep gorge and whitewater rapids formed by the Susitna River. When oil prices and state revenue (based on taxes levied on oil extraction) declined, the plan was put on hold. When oil prices rose to then-record highs in 2008, the rising price of electricity in Alaska caused a revival of interest in the proposal. The Susitna Hydroelectric project, to be built by the , was projected to cost $5.2 billion. A 735-foot (224 m) dam would be built on the Susitna River about 120 miles (190 km) north of Anchorage, forming a 42-square-mile (110 km2) reservoir. The dam would consistently produce between 280 and 300 megawatts of power, or about 2,800 GWh per year. The dam would be designed to accommodate a future height increase to 880 feet (270 m). Electricity from the dam would supply about two-thirds of Alaska's population. The alternative is use of natural gas as fuel for generators. Whether to build a natural gas pipeline is also at issue. The Susitna river, which drains into the Cook Inlet, is a major salmon spawning ground. The site of the proposed dam is upstream of the breeding grounds of salmon, but if the dam is constructed the pattern of flow in the river will change due to operation of the dam. On June 29, 2016, Alaska's governor Bill Walker vetoed the construction of the dam. The reasons were both environmental and economic.
rdf:langString Concrete arch
rdf:langString Location of the Susitna hydroelectric project in Alaska
<gigawattHour> 2800.0
<megawatt> 600.0
xsd:nonNegativeInteger 6023
rdf:langString Concrete arch
xsd:double 224.028
xsd:string Scrapped
<Geometry> POINT(-148.54861450195 62.822776794434)

data from the linked data cloud