Stateline Wind Farm
http://dbpedia.org/resource/Stateline_Wind_Farm an entity of type: Thing
The Stateline Wind Farm is a wind farm located on Vansycle Ridge, which receives 16 to 18 mph (26 – 29 km/h) average wind speeds from the Columbia Gorge, on the border between Washington and Oregon in the United States. With 454 turbines, it is the largest wind project in the Northwestern United States. Costing $300 million to build, it began operation in 2001. The Stateline Wind Project is several miles northwest of the Vansycle Wind Project in Umatilla County, Oregon. Both are owned and operated by Florida Power & Light, a division of NextEra Energy.
rdf:langString
rdf:langString
Stateline Wind Farm
rdf:langString
Stateline Wind Farm
rdf:langString
Stateline Wind Farm
xsd:float
46.03721618652344
xsd:float
-118.8065948486328
xsd:integer
2902151
xsd:integer
1107982017
rdf:langString
United States
rdf:langString
Turbines near the Walla Walla River
rdf:langString
Vansycle Ridge, Umatilla County, Oregon, and Walla Walla County, Washington
rdf:langString
Operational
xsd:integer
2001
2002
2009
xsd:string
46.037216666666666 -118.80659444444444
rdf:langString
The Stateline Wind Farm is a wind farm located on Vansycle Ridge, which receives 16 to 18 mph (26 – 29 km/h) average wind speeds from the Columbia Gorge, on the border between Washington and Oregon in the United States. With 454 turbines, it is the largest wind project in the Northwestern United States. Costing $300 million to build, it began operation in 2001. The project employs 660 kW capacity Vestas wind turbines, which collectively will produce a maximum electrical output of 306.9 MW. On average, the project is expected to produce 30 to 35 percent of that capacity year-round. Turbines are controlled individually by electronic systems which direct them into the wind and adjust the pitch of the blades to maximize electrical production at any wind speed from 7 to 56 mph (11.3 to 90 km/h). The turbines automatically shut down at wind speeds excess of 56 mph (90 km/h), a feature which allows them to withstand hurricane-force winds. The wind turbines are grouped in strings of 5 to 37 turbines, each turbine spaced approximately 250 feet (76 m) from the next, generally slightly downwind of the crest of ridges. Each turbine tower is 166 feet (50 m) tall, with blades 76 feet (23 m) wide. Environmental impact studies determined that the site was not used extensively by birds or other species vulnerable to injury from turbines, and the turbine towers' construction, along with the use of underground power lines, was designed to minimize perching places for birds. The area around the project is used primarily for private farming, including dryland wheat farming and cattle grazing. The Stateline Wind Project is several miles northwest of the Vansycle Wind Project in Umatilla County, Oregon. Both are owned and operated by Florida Power & Light, a division of NextEra Energy. A wind turbine collapsed over the weekend of November 2, 2013 on the Washington side of the Stateline Wind Project.
xsd:integer
2001
<megawatt>
222.0
307.0
xsd:integer
456
xsd:gYear
2001
xsd:nonNegativeInteger
6119
xsd:string
2001
xsd:gYear
2001
2002
2009
xsd:string
Operational
<Geometry>
POINT(-118.80659484863 46.037216186523)