St. Louis Bridge

http://dbpedia.org/resource/St._Louis_Bridge an entity of type: Thing

The St. Louis Bridge is a Canadian traffic bridge (and former railway bridge) that spans the South Saskatchewan River in St. Louis, Saskatchewan. It crosses the river from St. Louis into the Rural Municipality of Prince Albert No. 461. Construction of a new bridge to carry Highway 2 over the river was undertaken in the early 2010s 1.6 km east of the old bridge. It is possible that the old bridge will be demolished after the new one is completed. The new bridge was completed in the fall of 2014 at a cost of $30 million. rdf:langString
rdf:langString St. Louis Bridge
rdf:langString St. Louis Bridge
rdf:langString St. Louis (Grand Trunk Pacific Railway) Bridge
xsd:float 52.92499923706055
xsd:float -105.8079986572266
xsd:integer 25380988
xsd:integer 1113167844
xsd:integer 1915
rdf:langString St. Louis Bridge
rdf:langString Traffic
rdf:langString May 2022
rdf:langString Steel
rdf:langString St. Louis Bridge
rdf:langString April 1915
rdf:langString Bypass highway has been open for several years; info needed on bridge future and citation for when the bridge opened
xsd:string 52.925 -105.808
rdf:langString The St. Louis Bridge is a Canadian traffic bridge (and former railway bridge) that spans the South Saskatchewan River in St. Louis, Saskatchewan. It crosses the river from St. Louis into the Rural Municipality of Prince Albert No. 461. The bridge was built by the Grand Trunk Pacific Railway opening to rail traffic in 1915. In March 1928 work was completed on the attachment of two roadways onto the bridge, opening to traffic on May 9, 1928. The bridge continued to support the Canadian National Railway use until 1983 when the rail line was abandoned. The bridge was subsequently modified to carry road traffic on the former rail bed. Construction of a new bridge to carry Highway 2 over the river was undertaken in the early 2010s 1.6 km east of the old bridge. It is possible that the old bridge will be demolished after the new one is completed. The new bridge was completed in the fall of 2014 at a cost of $30 million.
<kilometre> 0.381
xsd:nonNegativeInteger 4217
xsd:string Traffic (Hwy 2)
xsd:string 1915
xsd:double 381.0
xsd:gYear 1915
<Geometry> POINT(-105.80799865723 52.924999237061)

data from the linked data cloud