Sri Damodaram Sanjeevaiah Thermal Power Station
http://dbpedia.org/resource/Sri_Damodaram_Sanjeevaiah_Thermal_Power_Station an entity of type: Thing
Sri Damodaram Sanjeevaiah Thermal Power Station is located in Nelatur Village, near Krishnapatnam and at a distance of 23 km from Nellore city of Andhra Pradesh. The power plant is one of the coal-based power plants of Andhra Pradesh Power Development Company Limited (APPDCL). It is the Special Purpose Vehicle (SPV), a joint venture company of APGENCO (with 50% equity) and IL AND FS (50% equity) partnership.
rdf:langString
rdf:langString
Sri Damodaram Sanjeevaiah Thermal Power Station
rdf:langString
Sri Damodaram Sanjeevaiah Thermal Power Station
rdf:langString
Sri Damodaram Sanjeevaiah Thermal Power Station
xsd:float
14.3100004196167
xsd:float
80.09999847412109
xsd:integer
36788454
xsd:integer
1112597730
rdf:langString
India
rdf:langString
Nellore, Andhra Pradesh
rdf:langString
Andhra Pradesh Power Development Company Limited
rdf:langString
Under Construction
xsd:string
14.31 80.1
rdf:langString
Sri Damodaram Sanjeevaiah Thermal Power Station is located in Nelatur Village, near Krishnapatnam and at a distance of 23 km from Nellore city of Andhra Pradesh. The power plant is one of the coal-based power plants of Andhra Pradesh Power Development Company Limited (APPDCL). It is the Special Purpose Vehicle (SPV), a joint venture company of APGENCO (with 50% equity) and IL AND FS (50% equity) partnership. The proposed capacity of plant is 1600 MW. The project is under construction and likely to be completed by the end of 2014. The Power station is designed for blended coal in the ratio of 70% washed domestic coal from Talcher Coalfield to 30% imported coal. Sea water is proposed for cooling purpose and potable water by desalination. Krishnapatnam port (about 5 km from site) will cater to the requirement of importing heavy machinery and both domestic & imported coal of 3.5 and 1.5 million tons per annum respectively. EPC contract for the main plant has been awarded to BHEL, L&T and Tata Projects Limited during July, 2008 and for BOP during February 2009. The estimated complete cost of project is about Rs 8432/- Crores. The Debt & Equity ratio is 80:20 and Project is being financed by PFC and KfW, Germany.
xsd:integer
2400
xsd:integer
2
xsd:integer
1
xsd:nonNegativeInteger
5296
xsd:string
Under Construction
<Geometry>
POINT(80.099998474121 14.310000419617)