Southwest LRT
http://dbpedia.org/resource/Southwest_LRT an entity of type: Thing
The Southwest LRT (Metro Green Line Extension) is an under–construction 14.5-mile (23.3 km) light rail transit corridor in Hennepin County, Minnesota, with service between Minneapolis and Eden Prairie. The estimated one-way travel time from Southwest Station in Eden Prairie to Target Field Station in Minneapolis is 32 minutes. The Southwest LRT will extend through St. Louis Park, Hopkins and Minnetonka along the route. Major locations on the line will include Bde Maka Ska, Cedar Lake, the Walker Art Center, the Minneapolis Sculpture Garden and Target Field in downtown Minneapolis.
rdf:langString
rdf:langString
Southwest LRT
rdf:langString
Southwest LRT
rdf:langString
Southwest LRT
xsd:integer
3993181
xsd:integer
1113652713
xsd:integer
16
xsd:integer
200
rdf:langString
Under construction
rdf:langString
The Southwest LRT (Metro Green Line Extension) is an under–construction 14.5-mile (23.3 km) light rail transit corridor in Hennepin County, Minnesota, with service between Minneapolis and Eden Prairie. The estimated one-way travel time from Southwest Station in Eden Prairie to Target Field Station in Minneapolis is 32 minutes. The Southwest LRT will extend through St. Louis Park, Hopkins and Minnetonka along the route. Major locations on the line will include Bde Maka Ska, Cedar Lake, the Walker Art Center, the Minneapolis Sculpture Garden and Target Field in downtown Minneapolis. Hennepin County selected the alignment of the route and worked with the Metropolitan Council on environmental impact statements for the project. The Metropolitan Council is managing construction of the route. On November 15, 2018, the council accepted an $800 million construction bid by Lunda Construction and C.S. McCrossan, with early construction starting in December 2018. The project has had unexpected construction delays, especially at the site of a tunnel near the Kenilworth Trail corridor. The delays have increased the cost of the project to up to about $2.7 billion and pushed back the expected opening date from 2023 to 2027.
rdf:langString
Surface
xsd:integer
34000
xsd:integer
2027
xsd:double
23335.488
xsd:nonNegativeInteger
16
xsd:nonNegativeInteger
25286
xsd:string
Under construction