South Attleboro station

http://dbpedia.org/resource/South_Attleboro_station an entity of type: Thing

South Attleboro station is an MBTA Commuter Rail Providence/Stoughton Line station in Attleboro, Massachusetts. It is located under Newport Avenue (Route 1A) in the South Attleboro neighborhood, just north of the Rhode Island border. The station has two side platforms serving the two tracks of the Northeast Corridor, connected by a footbridge to a park-and-ride lot. rdf:langString
rdf:langString South Attleboro station
rdf:langString
rdf:langString South Attleboro
rdf:langString South Attleboro
xsd:float 41.89759826660156
xsd:float -71.35579681396484
xsd:integer 1953421
xsd:integer 1105563388
rdf:langString yes
xsd:integer 1315
rdf:langString A purple and silver passenger train with a diesel locomotive arriving at a station
xsd:integer 2
xsd:date 2021-02-26
rdf:langString GATRA: 16
rdf:langString RIPTA: ,
rdf:langString An outbound train arrives at South Attleboro in June 2013
rdf:langString Attleboro Line
xsd:date 1990-07-30
rdf:langString yes
rdf:langString Future services
xsd:integer 579
xsd:integer 2018
xsd:integer 1144
xsd:integer 2
rdf:langString MBTA
xsd:integer 2
xsd:integer 7
xsd:string 41.8976 -71.3558
rdf:langString South Attleboro station is an MBTA Commuter Rail Providence/Stoughton Line station in Attleboro, Massachusetts. It is located under Newport Avenue (Route 1A) in the South Attleboro neighborhood, just north of the Rhode Island border. The station has two side platforms serving the two tracks of the Northeast Corridor, connected by a footbridge to a park-and-ride lot. Construction of the station was approved in 1987 and completed the next year. Opening was delayed by a dispute between the Massachusetts Bay Transportation Authority (MBTA) and the Massachusetts Architectural Access Board (MAAB) because the station was not accessible. After the MBTA and MAAB reached an agreement on the length of accessible platforms, the station opened in July 1990. The footbridge is in poor condition, with two sets of stairs closed off. The MBTA issued a contract for design of station improvements, including a new footbridge with elevators, in 2020. The station was temporarily closed on February 26, 2021.
xsd:nonNegativeInteger 20109
rdf:langString Attleboro, Massachusetts
rdf:langString
rdf:langString 1315Newport Avenue
xsd:string 2 spaces
xsd:date 2021-02-26
xsd:gYear 2021
xsd:string 7
xsd:boolean 1
xsd:nonNegativeInteger 2
xsd:date 1990-07-30
xsd:gYear 1990
xsd:string
xsd:string 579 spaces ($6.00 fee)
xsd:nonNegativeInteger 1144
xsd:string
xsd:string 2side platforms
xsd:gYear 2018
<Geometry> POINT(-71.355796813965 41.897598266602)

data from the linked data cloud