Sisimiut Hydro Power Plant
http://dbpedia.org/resource/Sisimiut_Hydro_Power_Plant an entity of type: Thing
La central hidroeléctrica de Sisimiut es una construcción cercana a Sisimiut, Groenlandia. La construcción comenzó en marzo de 2007 y se espera que se terminará en 2010. La potencia inicial de la central hidroeléctrica será de 15 MW. La electricidad será transportada a Sisimiut por una nueva línea de alta tensión de 27,4 km de longitud.
rdf:langString
Sisimiut Hydro Power Plant is a hydroelectric power plant near Sisimiut, Greenland. Construction started in March 2007 and the plant was commissioned on 7 April 2010. The initial capacity of the power plant is 15 MW. The construction included 3,000 cubic metres (110,000 cu ft) of concrete constructions, a blasted tunnel with length of 4,700 metres (15,400 ft) and a pressure pipe with length of 400 metres (1,300 ft). The altitude difference is 78.6 metres (258 ft). Produced electricity is transferred to Sisimiut by new 27.4 kilometres (17.0 mi) long 60 kV high voltage lines.
rdf:langString
De waterkrachtcentrale Sisimiut is een waterkrachtcentrale in Groenland bij de stad Sisimiut. Deze centrale heeft twee Francisturbines met een totale capaciteit van 15 MW.
rdf:langString
rdf:langString
Central hidroeléctrica de Sisimiut
rdf:langString
Waterkrachtcentrale Sisimiut
rdf:langString
Sisimiut Hydro Power Plant
rdf:langString
Sisimiut hydroelectric power plant
rdf:langString
Sisimiut hydroelectric power plant
xsd:float
67.11360931396484
xsd:float
-53.3488883972168
xsd:integer
15784578
xsd:integer
1104993211
rdf:langString
O
xsd:integer
2010
xsd:string
67.11361111111111 -53.34888888888889
rdf:langString
La central hidroeléctrica de Sisimiut es una construcción cercana a Sisimiut, Groenlandia. La construcción comenzó en marzo de 2007 y se espera que se terminará en 2010. La potencia inicial de la central hidroeléctrica será de 15 MW. La electricidad será transportada a Sisimiut por una nueva línea de alta tensión de 27,4 km de longitud.
rdf:langString
Sisimiut Hydro Power Plant is a hydroelectric power plant near Sisimiut, Greenland. Construction started in March 2007 and the plant was commissioned on 7 April 2010. The initial capacity of the power plant is 15 MW. The construction included 3,000 cubic metres (110,000 cu ft) of concrete constructions, a blasted tunnel with length of 4,700 metres (15,400 ft) and a pressure pipe with length of 400 metres (1,300 ft). The altitude difference is 78.6 metres (258 ft). Produced electricity is transferred to Sisimiut by new 27.4 kilometres (17.0 mi) long 60 kV high voltage lines.
rdf:langString
De waterkrachtcentrale Sisimiut is een waterkrachtcentrale in Groenland bij de stad Sisimiut. Deze centrale heeft twee Francisturbines met een totale capaciteit van 15 MW.
xsd:integer
2007
<megawatt>
15.0
xsd:gYear
2007
xsd:nonNegativeInteger
2642
xsd:string
2007
xsd:gYear
2010
xsd:string
O
xsd:double
15000000.0
<Geometry>
POINT(-53.348888397217 67.113609313965)