Severn Railway Bridge

http://dbpedia.org/resource/Severn_Railway_Bridge an entity of type: Thing

The Severn Railway Bridge (historically called the Severn Bridge) was a bridge carrying the railway across the River Severn between Sharpness and Lydney in Gloucestershire, England. It was built in the 1870s by the Severn Bridge Railway Company, primarily to carry coal from the Forest of Dean to the docks at Sharpness; it was the furthest-downstream bridge over the Severn until the opening of the Severn road bridge in 1966. When the company got into financial difficulties in 1893, it was taken over jointly by the Great Western Railway and the Midland Railway companies. The bridge continued to be used for freight and passenger services until 1960, and saw temporary extra traffic on the occasions that the Severn Tunnel was closed for engineering work. rdf:langString
rdf:langString Severn Railway Bridge
rdf:langString Severn Railway Bridge
xsd:float 51.73266983032227
xsd:float -2.473999977111816
xsd:integer 1067529
xsd:integer 1112861645
xsd:integer 1875
xsd:integer 1879
rdf:langString Severn Railway Bridge
rdf:langString Severn Railway Bridge in July 1948
xsd:date 1960-10-25
rdf:langString George Baker Keeling
xsd:integer 250
xsd:string 51.73267 -2.474
rdf:langString The Severn Railway Bridge (historically called the Severn Bridge) was a bridge carrying the railway across the River Severn between Sharpness and Lydney in Gloucestershire, England. It was built in the 1870s by the Severn Bridge Railway Company, primarily to carry coal from the Forest of Dean to the docks at Sharpness; it was the furthest-downstream bridge over the Severn until the opening of the Severn road bridge in 1966. When the company got into financial difficulties in 1893, it was taken over jointly by the Great Western Railway and the Midland Railway companies. The bridge continued to be used for freight and passenger services until 1960, and saw temporary extra traffic on the occasions that the Severn Tunnel was closed for engineering work. The bridge was constructed by Hamilston's Windsor Ironworks Company Limited of Garston, Liverpool. It was approached from the north via a masonry viaduct and had twenty-two spans. The pier columns were formed of circular sections, bolted together and filled with concrete. The twenty-one regular wrought iron spans were then put in place, as well as the southernmost span, the swinging bridge over the Gloucester and Sharpness Canal. The bridge was 4,162 ft (1,269 m) long and 70 ft (21 m) above high water. 6,800 long tons (7,600 short tons; 6,900 t) of iron were used in its construction. A number of accidents took place at the bridge over the years, with vessels colliding with the piers due to the strong tides. In 1960 two river barges hit one of the piers on the bridge, causing two spans to collapse into the river. Repair work was under consideration when a similar collision occurred the following year, after which it was decided that it would be uneconomical to repair the bridge. It was demolished between 1967 and 1970, with few traces remaining.
<kilometre> 1.2685776
xsd:nonNegativeInteger 24547
xsd:string 1879
xsd:string 1875
xsd:double 1268.5776
xsd:date 1960-10-25
<Geometry> POINT(-2.4739999771118 51.732669830322)

data from the linked data cloud