SAIT/AUArts/Jubilee station

http://dbpedia.org/resource/SAIT/AUArts/Jubilee_station an entity of type: Thing

SAIT/AUArts/Jubilee station, is a CTrain light rail station in Calgary Calgary, Alberta. It serves the Northwest Line (Route 201) and opened on September 7, 1987, as part of the original line. The station is located on the exclusive LRT right of way in the heart of the Southern Alberta Institute of Technology (SAIT) campus, 1.8 km northwest of the 7 Avenue & 9 Street SW. rdf:langString
rdf:langString SAIT/AUArts/Jubilee station
rdf:langString SAIT/AUArts/Jubilee
rdf:langString SAIT/AUArts/Jubilee
xsd:float 51.06277847290039
xsd:float -114.0908355712891
xsd:integer 1873903
xsd:integer 1098134554
rdf:langString yes
rdf:langString SAIT/ACA/Jubilee SAIT/ACAD/Jubilee
xsd:integer 1987
rdf:langString No connections to bus routes
rdf:langString None
rdf:langString Center-loading platform
xsd:integer 2014
rdf:langString At-grade
rdf:langString CTrain
xsd:string 51.062777777777775 -114.09083333333334
rdf:langString SAIT/AUArts/Jubilee station, is a CTrain light rail station in Calgary Calgary, Alberta. It serves the Northwest Line (Route 201) and opened on September 7, 1987, as part of the original line. The station is located on the exclusive LRT right of way in the heart of the Southern Alberta Institute of Technology (SAIT) campus, 1.8 km northwest of the 7 Avenue & 9 Street SW. The station possesses a center-loading platform which has grade-level access at the West end and +15 access at the East end connecting to both SAIT and the Alberta University of the Arts (AUArts). Stairs, an elevator and an escalator connect the platform to the +15. The station's full name is Southern Alberta Institute of Technology/Alberta University of the Arts/Southern Alberta Jubilee Auditorium. The station serves all of the aforementioned landmarks, and is also located close to the northern periphery of Riley Park. When the station opened, the signage read "SAIT/ACA/Jubilee", as the station was constructed eight years before the Alberta College of Art changed its name to Alberta College of Art and Design. The signage was changed to "SAIT/AUArts/Jubilee" in mid-2019 due to the name change of Alberta College of Art and Design to the Alberta University of the Arts, although some trains continued to announce "SAIT/ACAD/Jubilee" until late 2019. As part of Calgary Transit's plan to operate four-car trains by the end of 2014, all three-car platforms were to be extended. Construction of the extension for the then called SAIT/ACAD/Jubilee station started July 3, 2014 and was completed by the end of 2014.
xsd:nonNegativeInteger 3244
rdf:langString SAIT/ACAD/Jubilee
rdf:langString SAIT/ACA/Jubilee
xsd:boolean 1
xsd:gYear 1987
xsd:string No connections to bus routes
xsd:string None
xsd:string Center-loading platform
xsd:gYear 2014
xsd:string At-grade
<Geometry> POINT(-114.09083557129 51.0627784729)

data from the linked data cloud