R. E. Hoy No. 1 Oil Well

http://dbpedia.org/resource/R._E._Hoy_No._1_Oil_Well an entity of type: Thing

The R.E. Hoy No. 1 Oil Well was constructed by the Sinclair Oil & Refining Corporation in September 1916. It has been listed on the National Register of Historic Places since 1986. Milton C. Garber and his brother Bert Garber hired geologist Dorsey Hager to determine potential drilling locations on their properties. The Garber brothers contracted Harry F. Sinclair to construct a well on R. E. Hoy's farm (NE corner, Section 25, T22N, R4W,Garfield County). The well was drilled at a depth of 1,130–56 feet. At 4:00 AM on September 10, the oil began to flow, starting out at 90 to 100 barrels per day (16 m3/d). The Hoy sand was the first successful sand of the Garber-Covington oil field, and the first well to be drilled with the advice of a geologist. From 1916 to 1940 the well utilized primary rdf:langString
rdf:langString R. E. Hoy No. 1 Oil Well
rdf:langString Hoy, R. E., No. 1 Oil Well
rdf:langString Hoy, R. E., No. 1 Oil Well
xsd:float 36.35666656494141
xsd:float -97.57277679443359
xsd:integer 28403837
xsd:integer 1111451385
xsd:date 1986-09-26
rdf:langString Sinclair, Harry
rdf:langString less than one acre
xsd:integer 1916
rdf:langString Oklahoma#USA
xsd:integer 86002357
xsd:string 36.35666666666667 -97.57277777777777
rdf:langString The R.E. Hoy No. 1 Oil Well was constructed by the Sinclair Oil & Refining Corporation in September 1916. It has been listed on the National Register of Historic Places since 1986. Milton C. Garber and his brother Bert Garber hired geologist Dorsey Hager to determine potential drilling locations on their properties. The Garber brothers contracted Harry F. Sinclair to construct a well on R. E. Hoy's farm (NE corner, Section 25, T22N, R4W,Garfield County). The well was drilled at a depth of 1,130–56 feet. At 4:00 AM on September 10, the oil began to flow, starting out at 90 to 100 barrels per day (16 m3/d). The Hoy sand was the first successful sand of the Garber-Covington oil field, and the first well to be drilled with the advice of a geologist. From 1916 to 1940 the well utilized primary production, adding secondary methods of gas injection (1941 to 1948) and waterflooding (since 1948). At the time of nomination, the Hoy well was producing 4 barrels per day (0.64 m3/d), and had been in operation for 69 years.
xsd:nonNegativeInteger 2831
xsd:string 86002357
xsd:gYear 1916
<Geometry> POINT(-97.572776794434 36.356666564941)

data from the linked data cloud