Pudong railway
http://dbpedia.org/resource/Pudong_railway an entity of type: Thing
浦东线阮四段,与芦潮港线合称浦东铁路(一期),是上海洋山保税港工程的配套建设工程,曾被命名为上海轨道交通26号线。
rdf:langString
The Pudong railway (simplified Chinese: 浦东铁路; traditional Chinese: 浦東鐵路; pinyin: Pǔdōng Tiělù) is a railway line in operated by China Railway. Located entirely in Shanghai, China, the 42.87-kilometre-long (26.64 mi) railway line is used solely for freight services, although passenger services did operate along the line until 2015. At its western terminus, it branches off from the Jinshan railway at Jinshan Industrial Park in the city's Jinshan District and runs eastward to in Pudong, with three intermediate stations.
rdf:langString
rdf:langString
Pudong railway
rdf:langString
浦东线
rdf:langString
Pudong Railway
rdf:langString
Pudong Railway
xsd:integer
59950863
xsd:integer
1121754996
xsd:integer
5
rdf:langString
Train at Haiwan railway station on the Pudong railway
xsd:date
2015-08-27
rdf:langString
No
xsd:integer
294
xsd:integer
180
xsd:date
2005-12-09
xsd:date
2008-09-01
rdf:langString
Shanghai Pudong Railway Development Co., Ltd.
rdf:langString
Shanghai Railway Container Central Station Development Co., Ltd.
rdf:langString
Pǔdōng Tiělù
xsd:integer
1
rdf:langString
浦东铁路
rdf:langString
Operational
rdf:langString
浦東鐵路
xsd:integer
1
rdf:langString
The Pudong railway (simplified Chinese: 浦东铁路; traditional Chinese: 浦東鐵路; pinyin: Pǔdōng Tiělù) is a railway line in operated by China Railway. Located entirely in Shanghai, China, the 42.87-kilometre-long (26.64 mi) railway line is used solely for freight services, although passenger services did operate along the line until 2015. At its western terminus, it branches off from the Jinshan railway at Jinshan Industrial Park in the city's Jinshan District and runs eastward to in Pudong, with three intermediate stations. Construction of the railway line was completed on 9 December 2005. Passenger service on the line started on 1 September 2008, with trains travelling between Shanghai South and Luchaogang, with an intermediate stop at . These trains would use the Jinshan railway between Shanghai South and Jinshan Industrial Park, before switching to the Pudong railway and travelling the entire length of the line. Passenger service on the line was suspended on 27 August 2015, due to the presence of a hazardous chemicals storage yard near Luchaogang station. This safety measure was taken in response to the 2015 Tianjin explosions.
rdf:langString
浦东线阮四段,与芦潮港线合称浦东铁路(一期),是上海洋山保税港工程的配套建设工程,曾被命名为上海轨道交通26号线。
xsd:double
42870.0
xsd:nonNegativeInteger
5
xsd:double
120.0
xsd:nonNegativeInteger
7159
xsd:date
2015-08-27
xsd:gYear
2015
xsd:date
2005-12-09
xsd:date
2008-09-01
xsd:gYear
2005
2008
xsd:string
Operational (freight only)