Playford A Power Station

http://dbpedia.org/resource/Playford_A_Power_Station an entity of type: Thing

Playford A power station was the first power station built by the Electricity Trust of South Australia at Port Paterson, South Australia near Port Augusta in South Australia. It was built in 1954 to generate electricity from coal mined from the Telford Cut at Leigh Creek and transported 250 kilometres (160 mi) by rail. It was joined by the Playford B Power Station in 1963, and the Northern Power Station in 1985. rdf:langString
rdf:langString Playford A Power Station
rdf:langString Playford A Power Station
rdf:langString Playford A Power Station
xsd:float -32.53888702392578
xsd:float 137.7818145751953
xsd:integer 54682040
xsd:integer 1116963094
<second> 600.0
rdf:langString Australia
xsd:date 2017-07-29
rdf:langString
rdf:langString Demolished
xsd:integer 1954
xsd:integer 1985
xsd:string -32.538886 137.781822
rdf:langString Playford A power station was the first power station built by the Electricity Trust of South Australia at Port Paterson, South Australia near Port Augusta in South Australia. It was built in 1954 to generate electricity from coal mined from the Telford Cut at Leigh Creek and transported 250 kilometres (160 mi) by rail. It was joined by the Playford B Power Station in 1963, and the Northern Power Station in 1985. The first unit of the power station was opened by Governor Robert George on 23 July 1954. It was the first power station in South Australia which did not require the importation of fuel from interstate. It was expected to take a few years before all six units were operational. The life of Playford A and B stations was expected to be 30 years, the supply of coal then known to be available from Leigh Creek. Playford A was decommissioned in 1985, however the building remained until all three power stations were demolished in 2018. Flinders Power, a division of Alinta Energy, contracted out the demolition of all three power stations and remediating the site. The demolition and 1068ha site rehabilitation was completed in May 2019.
xsd:integer 90
xsd:nonNegativeInteger 5189
xsd:gYear 1954
xsd:string Demolished
<Geometry> POINT(137.7818145752 -32.538887023926)

data from the linked data cloud