Playford A Power Station
http://dbpedia.org/resource/Playford_A_Power_Station an entity of type: Thing
Playford A power station was the first power station built by the Electricity Trust of South Australia at Port Paterson, South Australia near Port Augusta in South Australia. It was built in 1954 to generate electricity from coal mined from the Telford Cut at Leigh Creek and transported 250 kilometres (160 mi) by rail. It was joined by the Playford B Power Station in 1963, and the Northern Power Station in 1985.
rdf:langString
rdf:langString
Playford A Power Station
rdf:langString
Playford A Power Station
rdf:langString
Playford A Power Station
xsd:float
-32.53888702392578
xsd:float
137.7818145751953
xsd:integer
54682040
xsd:integer
1116963094
<second>
600.0
rdf:langString
Australia
xsd:date
2017-07-29
rdf:langString
rdf:langString
Demolished
xsd:integer
1954
xsd:integer
1985
xsd:string
-32.538886 137.781822
rdf:langString
Playford A power station was the first power station built by the Electricity Trust of South Australia at Port Paterson, South Australia near Port Augusta in South Australia. It was built in 1954 to generate electricity from coal mined from the Telford Cut at Leigh Creek and transported 250 kilometres (160 mi) by rail. It was joined by the Playford B Power Station in 1963, and the Northern Power Station in 1985. The first unit of the power station was opened by Governor Robert George on 23 July 1954. It was the first power station in South Australia which did not require the importation of fuel from interstate. It was expected to take a few years before all six units were operational. The life of Playford A and B stations was expected to be 30 years, the supply of coal then known to be available from Leigh Creek. Playford A was decommissioned in 1985, however the building remained until all three power stations were demolished in 2018. Flinders Power, a division of Alinta Energy, contracted out the demolition of all three power stations and remediating the site. The demolition and 1068ha site rehabilitation was completed in May 2019.
xsd:integer
90
xsd:nonNegativeInteger
5189
xsd:gYear
1954
xsd:string
Demolished
<Geometry>
POINT(137.7818145752 -32.538887023926)