Perth Freight Link

http://dbpedia.org/resource/Perth_Freight_Link an entity of type: Thing

The Perth Freight Link was a proposed $1.9 billion project in Perth, Western Australia to improve the road freight link between Kewdale and Fremantle Harbour. The project was announced by the state government in May 2014, but was cancelled following a change of government at the March 2017 state election. rdf:langString
rdf:langString Perth Freight Link
rdf:langString Perth Freight Link
xsd:integer 48987857
xsd:integer 1123689947
rdf:langString proposed
xsd:date 2017-03-10
rdf:langString Southeast
rdf:langString Northwest
xsd:double 13.4
rdf:langString wa
rdf:langString Stage 2 options
rdf:langString freeway
rdf:langString The Perth Freight Link was a proposed $1.9 billion project in Perth, Western Australia to improve the road freight link between Kewdale and Fremantle Harbour. The project was announced by the state government in May 2014, but was cancelled following a change of government at the March 2017 state election. The proposal included multiple stages: a five-kilometre (3.1 mi) extension of Roe Highway to Stock Road (Roe 8); a second stage linking Roe 8 to Stirling Highway, bypassing fourteen sets of traffic signals (Roe 9); and a final stage connecting into the Port of Fremantle. The plan included mandatory GPS tracking of all vehicles over an undisclosed size or weight with a charge per kilometre being applied for vehicles travelling along the route between Muchea and North Fremantle. The extension would have taken the highway from its current terminus at Kwinana Freeway approximately five kilometres (3.1 mi) further west through the Beeliar Wetlands to Stock Road, near Forrest Road in Coolbellup. The proposed route was along or within the vicinity of an existing road reserve in the Perth Metropolitan Region Scheme.hThe project's environmental assessment by the Environmental Protection Authority (EPA) along with the approval of the development by WA Government Minister Albert Jacob was ruled invalid by the Chief Justice of the Supreme Court on 16 December 2015. On 30 March 2016 Greg McIntyre QC, acting for Corina Abraham, lodged writs in the Supreme Court of Western Australia, alleging that Minister of Aboriginal Affairs Peter Collier and the Department of Aboriginal Affairs cultural committee denied procedural fairness when it failed to consult her. On 24 August 2016 the Supreme Court dismissed Abraham's challenge. The Save Beeliar Wetlands group tried to challenge the highway in the High Court, but the court dismissed the challenge on 16 December 2016, saying there wasn't sufficient grounds for a challenge. Construction began in late 2016, following the signing of the contract to build Roe 8 by the Liberal state government. Opposition to the project continued, with protests and a second senate inquiry. The freight link was an election issue in the 2017 state election. The McGowan Government scrapped the entire project after winning office.
rdf:langString * Kwinana Freeway * Roe Highway
rdf:langString * Stirling Highway
rdf:langString Perth Freight Link
<kilometre> 13.4
xsd:nonNegativeInteger 39706
xsd:double 13400.0

data from the linked data cloud