Perimeter Road
http://dbpedia.org/resource/Perimeter_Road an entity of type: Thing
The Perimeter Road, also known as the Margaret River Perimeter Road, is a highway bypass of Margaret River, Western Australia. The seven-kilometre-long (4.3 mi) road deviates Bussell Highway traffic, including heavy vehicles, to the east of the town, and connects to a new airport access road. It is planned to eventually be a dual carriageway, but has initially been constructed as a single carriageway, in two stages. Construction of stage one, from south of Margaret River to Rosa Brook Road, began in December 2014 and was completed in May 2015. Construction of stage two – the remaining northern section – began in September 2017 and was completed in February 2019, with an opening in December 2018. An extension of John Archibald Drive and the redevelopment of Bussell Highway in the town were
rdf:langString
rdf:langString
Perimeter Road
rdf:langString
Perimeter Road
xsd:integer
44604260
xsd:integer
1054158998
rdf:langString
North
rdf:langString
South
xsd:integer
7
rdf:langString
WA
rdf:langString
highway
rdf:langString
The Perimeter Road, also known as the Margaret River Perimeter Road, is a highway bypass of Margaret River, Western Australia. The seven-kilometre-long (4.3 mi) road deviates Bussell Highway traffic, including heavy vehicles, to the east of the town, and connects to a new airport access road. It is planned to eventually be a dual carriageway, but has initially been constructed as a single carriageway, in two stages. Construction of stage one, from south of Margaret River to Rosa Brook Road, began in December 2014 and was completed in May 2015. Construction of stage two – the remaining northern section – began in September 2017 and was completed in February 2019, with an opening in December 2018. An extension of John Archibald Drive and the redevelopment of Bussell Highway in the town were included in the business case for constructing stage two. Stage two of the project received $60 million of funding from The Nationals Western Australia to enable a complete bypass to be constructed, rather than a "road to nowhere". The state government provided the $13 million to construct stage one. The total cost was $47.6 million. The project underwent an Environmental Impact Assessment and Aboriginal Heritage survey. Action was taken to compensate for the loss of native vegetation, and a zoologist was employed to identify and relocate native fauna at the start of stage one construction. The perimeter road has been designed to reduce congestion, improve safety for the many pedestrians, including tourists, who use the road, and provide heavy vehicles with a lesser gradient to ascend or descend.
rdf:langString
Bussell Highway
rdf:langString
Bussell Highway
xsd:integer
2018
rdf:langString
rdf:langString
Airport Access Road
rdf:langString
Darch Road
rdf:langString
John Archibald Drive
rdf:langString
Rosa Brook Road
rdf:langString
Perimeter Road
<kilometre>
7.0
xsd:nonNegativeInteger
7273
xsd:string
2018
xsd:double
7000.0