Penny's Bay Power Station
http://dbpedia.org/resource/Penny's_Bay_Power_Station an entity of type: Thing
竹篙灣燃氣輪機發電廠(英語:Penny's Bay Gas Turbine Power Station)位於香港大嶼山東部竹篙灣, 於1992年開始投產,屬於尖峰負載的中電後備機組,由中華電力有限公司(70%權益)及南方電網(30%權益)共同持有。 發電廠設有3台100MW單循環燃氣渦輪機,總發電量300MW。機組以柴油運作,能夠在9分鐘內投入運行。
rdf:langString
Penny's Bay Power Station (Chinese: 竹篙灣燃氣輪機發電廠) is a gas turbine power station in Penny's Bay, Hong Kong. The HKD 1.1 billion power station was commissioned on 25 March 1992. The complex consists of three open cycle gas turbines in a rectangular turbine hall with three smokestacks. The turbines were supplied by John Brown Engineering and generators by GEC-Alsthom. It is operated by CLP Power as a standby and peaking power station. The power plant can start up in 12 minutes. Its primary fuel is ultra low sulphur diesel (ULSD).
rdf:langString
rdf:langString
Penny's Bay Power Station
rdf:langString
竹篙灣燃氣輪機發電廠
rdf:langString
Penny's Bay Power Station
rdf:langString
竹篙灣燃氣輪機發電廠
rdf:langString
Penny's Bay Power Station
rdf:langString
竹篙灣燃氣輪機發電廠
xsd:float
22.32061195373535
xsd:float
114.0416946411133
xsd:integer
6358653
xsd:integer
1102931385
rdf:langString
The power station viewed from Wing Yan Road
rdf:langString
Castle Peak Power Company Limited
rdf:langString
Operational
xsd:date
1992-03-25
xsd:string
22.320611111111113 114.04169444444445
rdf:langString
Penny's Bay Power Station (Chinese: 竹篙灣燃氣輪機發電廠) is a gas turbine power station in Penny's Bay, Hong Kong. The HKD 1.1 billion power station was commissioned on 25 March 1992. The complex consists of three open cycle gas turbines in a rectangular turbine hall with three smokestacks. The turbines were supplied by John Brown Engineering and generators by GEC-Alsthom. It is operated by CLP Power as a standby and peaking power station. The power plant can start up in 12 minutes. Its primary fuel is ultra low sulphur diesel (ULSD). It is located at Penny's Bay on Lantau Island and its nameplate capacity is 300MW. The plant serves as a backup facility providing quick start support to CLP Power's generating system. The plant attained a thermal efficiency between 10.1% to 23.3% from 2012 to 2016. Power from the station is delivered by CLP's 132kV transmission network and through submarine cables to customers outside Lantau Island.
rdf:langString
竹篙灣燃氣輪機發電廠(英語:Penny's Bay Gas Turbine Power Station)位於香港大嶼山東部竹篙灣, 於1992年開始投產,屬於尖峰負載的中電後備機組,由中華電力有限公司(70%權益)及南方電網(30%權益)共同持有。 發電廠設有3台100MW單循環燃氣渦輪機,總發電量300MW。機組以柴油運作,能夠在9分鐘內投入運行。
rdf:langString
No
<megawatt>
300.0
xsd:integer
3
xsd:nonNegativeInteger
2992
xsd:date
1992-03-25
xsd:gYear
1992
xsd:string
Operational
xsd:double
300000000.0
<Geometry>
POINT(114.04169464111 22.320611953735)