Old Dalby Test Track

http://dbpedia.org/resource/Old_Dalby_Test_Track an entity of type: SpatialThing

The Old Dalby Test Track is a railway in the United Kingdom which is used for testing new designs of trains and railway infrastructure. It runs between Melton Mowbray, Leicestershire and Edwalton, on the course of the Midland Railway's route between Kettering and Nottingham which closed to passengers on 1 May 1967, and to goods in 1968. It is 13.5 miles (21.7 km) in length. rdf:langString
rdf:langString Old Dalby Test Track
xsd:float 52.80888748168945
xsd:float -0.9933333396911621
xsd:integer 20221446
xsd:integer 1105686412
xsd:string 52.80888888888889 -0.9933333333333334
rdf:langString The Old Dalby Test Track is a railway in the United Kingdom which is used for testing new designs of trains and railway infrastructure. It runs between Melton Mowbray, Leicestershire and Edwalton, on the course of the Midland Railway's route between Kettering and Nottingham which closed to passengers on 1 May 1967, and to goods in 1968. It is 13.5 miles (21.7 km) in length. Since its first use at a test track in May 1966, the Old Dalby Test Track has been involved in numerous projects, one early major initiative being British Rail Research Division's Advanced Passenger Train project. In addition to its use by trains, various elements of line-side infrastructure, such as overhead line (OHLE) and signaling equipment, have also been tested on the line. During July 1984, a destructive full-scale integrity test of a nuclear flask train was conducted, witnessed by a large crowd; most testing has been closed to the public and security measures are typically present around the line to deter intrusion. During the mid-1990s, as a result of British Rail's privatisation, ownership of the line was transferred to BRB (Residuary) Limited, while its historic main user, the Research Division, was abolished. In the privatisation era, Old Dalby has been leased out to various companies, including Serco, Alstom, and Metronet (British infrastructure company), to conduct testing. Alstom electrified the former Down line using 25 kV AC OHLE at a reported cost of £25 million, and reinstated a six mile portion of the Up line, to support its activities. During the 2010s, there was public speculation that the test track could form part of a direct link between Nottingham and Melton Mowbray for the purpose of re-introducing a passenger service.
xsd:nonNegativeInteger 14119
<Geometry> POINT(-0.99333333969116 52.808887481689)

data from the linked data cloud