North Spokane Corridor

http://dbpedia.org/resource/North_Spokane_Corridor an entity of type: Thing

The U.S. Route 395 North Spokane Corridor (NSC) is a 10.5-mile-long (16.9 km) freeway - with 5.42 miles (8.72 km) complete and currently operational – running north–south along the eastern border of Spokane, Washington and parts of unincorporated Spokane County to the north. The $2.2 billion (2009 dollars) project is designed to improve freight and commuter mobility through the Spokane metropolitan area. As of 2020, only the northern half from Francis Avenue to U.S. Route 395 is open to traffic; the southern half received state funding in 2015 and is anticipated to be completed by 2029. rdf:langString
rdf:langString North Spokane Corridor
rdf:langString North Spokane Corridor
rdf:langString U.S. Route 395 North Spokane Corridor
rdf:langString North Spokane Corridor
xsd:integer 14967085
xsd:integer 1122998558
xsd:double 162.03 164.03 165.05 165.39 167.45
rdf:langString U.S. Route 395 North Spokane Corridor
rdf:langString South
rdf:langString North
xsd:gMonthDay --08-22
rdf:langString Planned completion by 2028
rdf:langString in Spokane
xsd:double 5.42
rdf:langString Mead
rdf:langString Spokane
rdf:langString Spokane County
xsd:integer 3 4
rdf:langString Planned route for the North Spokane Corridor
rdf:langString Northern terminus
rdf:langString Planned southern terminus
rdf:langString Connects to Division via East Hawthorne Road
rdf:langString Southern terminus of built section
rdf:langString Northbound exit at US 2 and southbound exit at Shady Slope Rd.
rdf:langString Francis Avenue
rdf:langString Parksmith Drive
rdf:langString Wellesley Avenue
xsd:integer 395
rdf:langString WA
rdf:langString in Spokane
rdf:langString in Spokane
rdf:langString US
rdf:langString unbuilt
rdf:langString The U.S. Route 395 North Spokane Corridor (NSC) is a 10.5-mile-long (16.9 km) freeway - with 5.42 miles (8.72 km) complete and currently operational – running north–south along the eastern border of Spokane, Washington and parts of unincorporated Spokane County to the north. The $2.2 billion (2009 dollars) project is designed to improve freight and commuter mobility through the Spokane metropolitan area. As of 2020, only the northern half from Francis Avenue to U.S. Route 395 is open to traffic; the southern half received state funding in 2015 and is anticipated to be completed by 2029. The project is being managed by the Washington State Department of Transportation (WSDOT) and will ultimately create a freeway with a speed limit of 60 mph (97 km/h) along a new alignment linking Interstate 90 (I-90), to the existing US Route 395 (US 395) 10.5 miles (16.9 km) to the north in the Wandermere area. When completed, the multi-modal facility is expected to have general travel lanes, with right-of-way reserved for a future high-capacity transit system with park-and-ride lots. Additionally, a pedestrian and bicycle trail will run along the entire highway alignment. The project is ranked 19 of 43 on the Congressional High Priority Corridor list of the National Highway System. When completed, the corridor is expected to carry over 150,000 vehicles per day.
rdf:langString UC
rdf:langString Planned:
xsd:integer 397
rdf:langString WA
xsd:integer 339
rdf:langString WA
<kilometre> 8.72264448
xsd:nonNegativeInteger 21425
xsd:double 8722.644480000001
xsd:string North
xsd:string 395
xsd:string South
xsd:string US

data from the linked data cloud