North Spokane Corridor
http://dbpedia.org/resource/North_Spokane_Corridor an entity of type: Thing
The U.S. Route 395 North Spokane Corridor (NSC) is a 10.5-mile-long (16.9 km) freeway - with 5.42 miles (8.72 km) complete and currently operational – running north–south along the eastern border of Spokane, Washington and parts of unincorporated Spokane County to the north. The $2.2 billion (2009 dollars) project is designed to improve freight and commuter mobility through the Spokane metropolitan area. As of 2020, only the northern half from Francis Avenue to U.S. Route 395 is open to traffic; the southern half received state funding in 2015 and is anticipated to be completed by 2029.
rdf:langString
rdf:langString
North Spokane Corridor
rdf:langString
North Spokane Corridor
rdf:langString
U.S. Route 395 North Spokane Corridor
rdf:langString
North Spokane Corridor
xsd:integer
14967085
xsd:integer
1122998558
xsd:double
162.03
164.03
165.05
165.39
167.45
rdf:langString
U.S. Route 395 North Spokane Corridor
rdf:langString
South
rdf:langString
North
xsd:gMonthDay
--08-22
rdf:langString
Planned completion by 2028
rdf:langString
in Spokane
xsd:double
5.42
rdf:langString
Mead
rdf:langString
Spokane
rdf:langString
Spokane County
xsd:integer
3
4
rdf:langString
Planned route for the North Spokane Corridor
rdf:langString
Northern terminus
rdf:langString
Planned southern terminus
rdf:langString
Connects to Division via East Hawthorne Road
rdf:langString
Southern terminus of built section
rdf:langString
Northbound exit at US 2 and southbound exit at Shady Slope Rd.
rdf:langString
Francis Avenue
rdf:langString
Parksmith Drive
rdf:langString
Wellesley Avenue
xsd:integer
395
rdf:langString
WA
rdf:langString
in Spokane
rdf:langString
in Spokane
rdf:langString
US
rdf:langString
unbuilt
rdf:langString
The U.S. Route 395 North Spokane Corridor (NSC) is a 10.5-mile-long (16.9 km) freeway - with 5.42 miles (8.72 km) complete and currently operational – running north–south along the eastern border of Spokane, Washington and parts of unincorporated Spokane County to the north. The $2.2 billion (2009 dollars) project is designed to improve freight and commuter mobility through the Spokane metropolitan area. As of 2020, only the northern half from Francis Avenue to U.S. Route 395 is open to traffic; the southern half received state funding in 2015 and is anticipated to be completed by 2029. The project is being managed by the Washington State Department of Transportation (WSDOT) and will ultimately create a freeway with a speed limit of 60 mph (97 km/h) along a new alignment linking Interstate 90 (I-90), to the existing US Route 395 (US 395) 10.5 miles (16.9 km) to the north in the Wandermere area. When completed, the multi-modal facility is expected to have general travel lanes, with right-of-way reserved for a future high-capacity transit system with park-and-ride lots. Additionally, a pedestrian and bicycle trail will run along the entire highway alignment. The project is ranked 19 of 43 on the Congressional High Priority Corridor list of the National Highway System. When completed, the corridor is expected to carry over 150,000 vehicles per day.
rdf:langString
UC
rdf:langString
Planned:
xsd:integer
397
rdf:langString
WA
xsd:integer
339
rdf:langString
WA
<kilometre>
8.72264448
xsd:nonNegativeInteger
21425
xsd:double
8722.644480000001
xsd:string
North
xsd:string
395
xsd:string
South
xsd:string
US