Nidd Valley Light Railway
http://dbpedia.org/resource/Nidd_Valley_Light_Railway an entity of type: Thing
Nidd Valley Light Railway was a light railway in upper Nidderdale in the West Riding of Yorkshire, England. It was owned by Bradford Corporation Waterworks Department and the corporation also operated its public passenger services. Power & Traction Ltd of London obtained a Light Railway Order for the 6.5-mile (10.5 km) railway from Pateley Bridge to Lofthouse in 1900, but these powers were taken over by Bradford Corporation. A contract to build Angram Reservoir was awarded to John Best & Son in 1903, and he also won the contract to build the public railway and a 6.5-mile (10.5 km) private extension to the reservoir site. This was initially built to 3 ft (914 mm) gauge but was converted to standard gauge by 1907, when the public railway opened. Best had his own locomotives, and Bradford Cor
rdf:langString
rdf:langString
Nidd Valley Light Railway
rdf:langString
rdf:langString
Nidd Valley Light Railway
rdf:langString
Nidd Valley Light Railway
xsd:float
54.18055725097656
xsd:float
-1.939444422721863
xsd:integer
21953746
xsd:integer
1117460160
xsd:integer
4
xsd:integer
4
rdf:langString
auto
rdf:langString
The former station building at Wath
xsd:date
1929-12-31
xsd:integer
240
xsd:date
1907-09-11
rdf:langString
Bradford Corporation
rdf:langString
closed
rdf:langString
Single
xsd:string
54.18055555555556 -1.9394444444444443
rdf:langString
Nidd Valley Light Railway was a light railway in upper Nidderdale in the West Riding of Yorkshire, England. It was owned by Bradford Corporation Waterworks Department and the corporation also operated its public passenger services. Power & Traction Ltd of London obtained a Light Railway Order for the 6.5-mile (10.5 km) railway from Pateley Bridge to Lofthouse in 1900, but these powers were taken over by Bradford Corporation. A contract to build Angram Reservoir was awarded to John Best & Son in 1903, and he also won the contract to build the public railway and a 6.5-mile (10.5 km) private extension to the reservoir site. This was initially built to 3 ft (914 mm) gauge but was converted to standard gauge by 1907, when the public railway opened. Best had his own locomotives, and Bradford Corporation equipped the public railway with second hand locomotives and carriages from the Metropolitan Railway. The Angram Reservoir project was completed in 1916. The corporation had obtained powers to build another reservoir at Scar House in 1913, and in 1920 decided to proceed, using direct labour rather than a contractor. The railway was upgraded, with the purchase on new and second hand locomotives, a railmotor for the public services, and second hand carriages for the workmen's trains. Curves on the line above Lofthouse were eased, and a short tunnel was built. At its height, the corporation were running fourteen locomotives, three steam navvies and 19 or 20 steam cranes. The work was essentially completed by 1931, but filling of the reservoir did not begin until 1935 and the official opening was the following year. With the work complete, the railway was lifted, and a sale was held at Pateley Bridge. Scar Village, which at its peak had housed 1,135 people, of whom 780 worked on the project, was reduced to eight occupied houses by 1936, with seven pupils at the school. The railway workers were not entitled to a pension, but pensions were awarded to four men who had served for many years.
xsd:double
6.5
<foot>
3.0
xsd:double
10460.736
xsd:nonNegativeInteger
4
xsd:double
1.2192
xsd:nonNegativeInteger
37796
xsd:date
1929-12-31
xsd:gYear
1929
xsd:date
1907-09-11
xsd:gYear
1907
xsd:string
closed
<Geometry>
POINT(-1.9394444227219 54.180557250977)