http://dbpedia.org/resource/Nevada_Solar_One an entity of type: Thing

Nevada Solar One nahe Boulder City im amerikanischen Bundesstaat Nevada ist ein Solarwärmekraftwerk. Die im Juni 2007 ans Netz gegangene 64-MW-Anlage wurde vom amerikanischen Energieministerium DOE, dem National Renewable Energy Laboratory NREL und dem Unternehmen erstellt. Die spanische Acciona-Gruppe hat 55 % von Solargenix übernommen und ist nun Besitzerin der Großanlage, die sich über 1,4 km² erstreckt. rdf:langString
El Nevada Solar One es un parque de energía solar que se construye en el estado de Nevada, Estados Unidos. Este parque, construido por Acciona,​ será el tercer parque solar más grande del mundo, y el de mayor potencia implementada en los últimos 15 años, con 64 MW.​ Está previsto que el parque comience a producir electricidad durante el año 2007.​ rdf:langString
Nevada Solar One est une centrale solaire thermique dans le désert du Nevada, aux États-Unis d'Amérique. Cette centrale électrique était à la date de sa mise en service en 2007, la deuxième plus grande installation solaire thermique au monde (400 acres ou 1,6 km2) après celle de Kramer Junction, qui est aussi dans le désert des Mojaves. rdf:langString
Nevada Solar One – elektrownia słoneczna w Boulder City w stanie Nevada w USA. Wytwarza energię o mocy 64 MW. Jej budowa zakończyła się w czerwcu 2007 roku. Zajmuje powierzchnię 400 akrów. rdf:langString
Nevada Solar One is a concentrated solar power plant, with a nominal capacity of 64 MW and maximum steam turbine power output up to 72 MW net (75 MW gross), spread over an area of 400 acres (160 ha). The projected CO2 emissions avoided is equivalent to taking approximately 20,000 cars off the road. The project required an investment of $266 million USD, and the project officially went into operation in June 2007. Electricity production is estimated to be 134 GWh (gigawatt hours) per year. rdf:langString
La Nevada Solar One è una centrale solare termoelettrica con una capacità nominale di 64 MW e una potenza lorda di 75 MW. Il progetto ha richiesto un investimento di 266 milioni di dollari e la produzione energetica stimata ammonta a 134 milioni di kWh all'anno. rdf:langString
Nevada Solar One (англ. Nevada Solar One) — концентрированная солнечная электростанция с номинальной мощностью 64 МВт и максимальной выходной мощностью паровой турбины до 72 МВт нетто (75 МВт брутто), расположенная на площади 400 акров (160 га). Предполагаемый объём предотвращенных выбросов CO2 эквивалентен снятию с дороги примерно 20 000 автомобилей. Проект потребовал инвестиций в размере 266 миллионов долларов США, и проект официально был введен в эксплуатацию в июне 2007 года. Производство электроэнергии оценивается в 134 ГВт-ч (гигаватт-час) в год. rdf:langString
rdf:langString Nevada Solar One
rdf:langString Nevada Solar One
rdf:langString Nevada Solar One
rdf:langString Nevada Solar One
rdf:langString Nevada Solar One
rdf:langString Nevada Solar One
rdf:langString Nevada Solar One
rdf:langString Nevada Solar One
rdf:langString Nevada Solar One
xsd:float 35.79999923706055
xsd:float -114.9766693115234
xsd:integer 3171694
xsd:integer 1100703390
rdf:langString P
xsd:integer 2606
rdf:langString CSP
<usDollar> 2.66E8
rdf:langString United States
rdf:langString November 2017
rdf:langString right
rdf:langString Photograph of Nevada Solar One, with the Las Vegas Valley beyond the mountains behind it
rdf:langString peak load is at sunset, see Duck curve
rdf:langString O
xsd:string 35.8 -114.97666666666667
rdf:langString Nevada Solar One nahe Boulder City im amerikanischen Bundesstaat Nevada ist ein Solarwärmekraftwerk. Die im Juni 2007 ans Netz gegangene 64-MW-Anlage wurde vom amerikanischen Energieministerium DOE, dem National Renewable Energy Laboratory NREL und dem Unternehmen erstellt. Die spanische Acciona-Gruppe hat 55 % von Solargenix übernommen und ist nun Besitzerin der Großanlage, die sich über 1,4 km² erstreckt.
rdf:langString El Nevada Solar One es un parque de energía solar que se construye en el estado de Nevada, Estados Unidos. Este parque, construido por Acciona,​ será el tercer parque solar más grande del mundo, y el de mayor potencia implementada en los últimos 15 años, con 64 MW.​ Está previsto que el parque comience a producir electricidad durante el año 2007.​
rdf:langString Nevada Solar One is a concentrated solar power plant, with a nominal capacity of 64 MW and maximum steam turbine power output up to 72 MW net (75 MW gross), spread over an area of 400 acres (160 ha). The projected CO2 emissions avoided is equivalent to taking approximately 20,000 cars off the road. The project required an investment of $266 million USD, and the project officially went into operation in June 2007. Electricity production is estimated to be 134 GWh (gigawatt hours) per year. In 2007, when the plant came on line, it was the second solar thermal energy (STE) power plant built in the United States in more than 16 years, and in 2007, the largest STE plant built in the world since 1991. It is located in Eldorado Valley in the southwest fringe of Boulder City, Nevada, and was built in that city's Energy Resource Zone, which requires renewable generation as part of plant development permits; Nevada Solar One was approved as part of Duke Energy's larger El Dorado Energy project that built 1 GW of electrical generation capacity. The solar trough generation was built by Acciona Solar Power, a partially owned subsidiary of Spanish conglomerate Acciona Energy. Lauren Engineers & Constructors (Abilene, TX) was the EPC contractor for the project. Acciona purchased a 55 percent stake in Solargenix (formerly Duke Solar) and Acciona owns 95 percent of the project. Nevada Solar One is unrelated to the Solar One power plant in California.
rdf:langString Nevada Solar One est une centrale solaire thermique dans le désert du Nevada, aux États-Unis d'Amérique. Cette centrale électrique était à la date de sa mise en service en 2007, la deuxième plus grande installation solaire thermique au monde (400 acres ou 1,6 km2) après celle de Kramer Junction, qui est aussi dans le désert des Mojaves.
rdf:langString La Nevada Solar One è una centrale solare termoelettrica con una capacità nominale di 64 MW e una potenza lorda di 75 MW. Il progetto ha richiesto un investimento di 266 milioni di dollari e la produzione energetica stimata ammonta a 134 milioni di kWh all'anno. È la seconda centrale energetica a solare termico costruita negli Stati Uniti negli ultimi 16 anni, e il più grande impianto a solare termodinamico costruito al mondo dal 1991. Si trova al confine sudovest di Boulder City, Nevada. La Nevada Solar One non ha alcun rapporto con la Solar One (impianto solare in California), benché abbiano un nome simile.
rdf:langString Nevada Solar One – elektrownia słoneczna w Boulder City w stanie Nevada w USA. Wytwarza energię o mocy 64 MW. Jej budowa zakończyła się w czerwcu 2007 roku. Zajmuje powierzchnię 400 akrów.
rdf:langString Nevada Solar One (англ. Nevada Solar One) — концентрированная солнечная электростанция с номинальной мощностью 64 МВт и максимальной выходной мощностью паровой турбины до 72 МВт нетто (75 МВт брутто), расположенная на площади 400 акров (160 га). Предполагаемый объём предотвращенных выбросов CO2 эквивалентен снятию с дороги примерно 20 000 автомобилей. Проект потребовал инвестиций в размере 266 миллионов долларов США, и проект официально был введен в эксплуатацию в июне 2007 года. Производство электроэнергии оценивается в 134 ГВт-ч (гигаватт-час) в год. В 2007 году, когда электростанция была введена в эксплуатацию, это была вторая солнечная тепловая электростанция (STE), построенная в США за более чем 16 лет, а в 2007 году — самая большая электростанция STE, построенная в мире с 1991 года. Она расположена в долине Эльдорадо на юго-западной окраине Боулдер-Сити, штат Невада, и была построена в Зоне энергоресурсов этого города, для которой необходимы возобновляемые источники энергии в рамках разрешений на строительство завода; Nevada Solar One была одобрена как часть более крупного проекта Duke Energy El Dorado Energy, в рамках которого была построена электрическая мощность мощностью 1 ГВт. Генерация солнечного желоба была построена Acciona Solar Power, частично принадлежащей дочерней компанией испанского конгломерата Acciona Energy. Компания Lauren Engineers & Constructors (Абилин, Техас) была EPC-подрядчиком проекта. Acciona приобрела 55 процентов акций Solargenix (ранее Duke Solar), а Acciona владеет 95 процентами проекта. Nevada Solar One не имеет отношения к электростанции Solar One в Калифорнии.
xsd:double 115.9
<perCent> 18.4
xsd:integer 72
rdf:langString Siemens SST-700
xsd:integer 1
xsd:float 18.39999961853027
xsd:nonNegativeInteger 15238
xsd:string O
<Geometry> POINT(-114.97666931152 35.799999237061)