Navi Mumbai Metro
http://dbpedia.org/resource/Navi_Mumbai_Metro an entity of type: Thing
新孟買地鐵是印度新孟買興建中的地鐵系統,由負責規劃及建設,預計將興建5條鐵路線,總長度達106.4公里(66.1英里)。 2011年5月1日,新孟買地鐵開工,在一系列工程延誤後,第一條線原應在2020年通車。然而,由於新冠疫情導致封城、宵禁和勞工缺乏,拖延了工程,新孟買地鐵第一條線進一步推遲至2022年通車。
rdf:langString
The Navi Mumbai Metro is a rapid transit system under construction in the Indian city of Navi Mumbai, Maharashtra. The planning and construction of the Navi Mumbai Metro is being overseen by the City and Industrial Development Corporation (CIDCO). The system is planned to consist of five rail lines covering a total distance of 106.4 kilometres (66.1 mi). The foundation stone for the project was laid on 1 May 2011; following construction delays, the metro's first line was projected to open in 2020. However, due to the ongoing COVID-19 pandemic, which caused lockdowns, curfews, and lack of labour, which resulted in several delays in construction, the deadline is pushed to 2022 for completion of the first line (Line 1) of Navi Mumbai Metro. The metro's technological infrastructure and rolling
rdf:langString
rdf:langString
Navi Mumbai Metro
rdf:langString
新孟買地鐵
rdf:langString
Navi Mumbai Metro
rdf:langString
Navi Mumbai Metro
xsd:integer
27975171
xsd:integer
1095750466
xsd:integer
20
xsd:integer
3
xsd:integer
275
rdf:langString
CIDCO Bhavan, Sion Panvel Highway, CBD Belapur, Navi Mumbai
xsd:integer
1
rdf:langString
नवी मुंबई मेट्रो
rdf:langString
The Navi Mumbai Metro is a rapid transit system under construction in the Indian city of Navi Mumbai, Maharashtra. The planning and construction of the Navi Mumbai Metro is being overseen by the City and Industrial Development Corporation (CIDCO). The system is planned to consist of five rail lines covering a total distance of 106.4 kilometres (66.1 mi). The foundation stone for the project was laid on 1 May 2011; following construction delays, the metro's first line was projected to open in 2020. However, due to the ongoing COVID-19 pandemic, which caused lockdowns, curfews, and lack of labour, which resulted in several delays in construction, the deadline is pushed to 2022 for completion of the first line (Line 1) of Navi Mumbai Metro. The metro's technological infrastructure and rolling stock are being provided by Ansaldo STS, Tata Projects and CSR Zhuzhou.
rdf:langString
新孟買地鐵是印度新孟買興建中的地鐵系統,由負責規劃及建設,預計將興建5條鐵路線,總長度達106.4公里(66.1英里)。 2011年5月1日,新孟買地鐵開工,在一系列工程延誤後,第一條線原應在2020年通車。然而,由於新冠疫情導致封城、宵禁和勞工缺乏,拖延了工程,新孟買地鐵第一條線進一步推遲至2022年通車。
rdf:langString
Elevated
rdf:langString
Overhead catenary
xsd:integer
2022
xsd:nonNegativeInteger
20
xsd:nonNegativeInteger
20929
xsd:nonNegativeInteger
1
xsd:gYear
2022