Metro Purple Line (Minnesota)

http://dbpedia.org/resource/Metro_Purple_Line_(Minnesota)

The METRO Purple Line, formerly known as the Rush Line Corridor, is a proposed bus rapid transit service that would run from Union Depot in downtown Saint Paul to the northeastern suburbs of Saint Paul. Along the corridor's 21 proposed stations there are 106,000 jobs within a 10-minute walk. The project is currently in an environmental analysis phase with further development, engineering, and construction expected to take at least six more years. Service would run 7-days a week with 10-minute headways in peak periods and 15-minute service at most other times. The corridor was named the Rush Line because it was originally planned to end in Rush City, Minnesota. After using the color purple since 2017, the route was officially named the Purple Line and became part of the METRO network on Jul rdf:langString
rdf:langString Metro Purple Line (Minnesota)
xsd:integer 7650944
xsd:integer 1118803663
xsd:integer 21
rdf:langString #782b90
xsd:integer 270
rdf:langString max
rdf:langString Downtown St. Paul
<mile> 15.0
rdf:langString Metro Minnesota icon.svg
xsd:integer 30
rdf:langString Purple Line
rdf:langString White Bear Lake
rdf:langString Planning Stages
rdf:langString white
rdf:langString The METRO Purple Line, formerly known as the Rush Line Corridor, is a proposed bus rapid transit service that would run from Union Depot in downtown Saint Paul to the northeastern suburbs of Saint Paul. Along the corridor's 21 proposed stations there are 106,000 jobs within a 10-minute walk. The project is currently in an environmental analysis phase with further development, engineering, and construction expected to take at least six more years. Service would run 7-days a week with 10-minute headways in peak periods and 15-minute service at most other times. The corridor was named the Rush Line because it was originally planned to end in Rush City, Minnesota. After using the color purple since 2017, the route was officially named the Purple Line and became part of the METRO network on July 14, 2021.
xsd:integer 7400
xsd:nonNegativeInteger 17266

data from the linked data cloud