Merchants Bridge

http://dbpedia.org/resource/Merchants_Bridge an entity of type: Thing

The Merchants Bridge, officially the Merchants Memorial Mississippi Rail Bridge, is a rail bridge crossing the Mississippi River between St. Louis, Missouri, and Venice, Illinois. The bridge is owned by the Terminal Railroad Association of St. Louis. It opened in May 1889 and crosses the river 3 miles (5 km) north of the Eads Bridge. rdf:langString
rdf:langString Merchants Bridge
rdf:langString Merchants Bridge
rdf:langString Merchants Memorial Mississippi Rail Bridge
xsd:float 38.67472076416016
xsd:float -90.18611145019531
xsd:integer 4090055
xsd:integer 1119357828
xsd:integer 70
rdf:langString Merchants Bridge
rdf:langString Merchants Bridge
rdf:langString Amtrak
rdf:langString Freight and passenger traffic
rdf:langString Steel truss bridge
xsd:integer 20
xsd:integer 300
rdf:langString St. Louis, Missouri, and Venice, Illinois
rdf:langString Merchants Memorial Mississippi Rail Bridge
xsd:integer 1889
xsd:integer 2022
rdf:langString Crossings
xsd:integer 20
xsd:string 38.67472222222222 -90.18611111111112
rdf:langString The Merchants Bridge, officially the Merchants Memorial Mississippi Rail Bridge, is a rail bridge crossing the Mississippi River between St. Louis, Missouri, and Venice, Illinois. The bridge is owned by the Terminal Railroad Association of St. Louis. It opened in May 1889 and crosses the river 3 miles (5 km) north of the Eads Bridge. The bridge was originally built by the St. Louis Merchants Exchange after it lost control of the Eads Bridge it had built to the Terminal Railroad. The Exchange feared a Terminal Railroad monopoly on the bridges but it would eventually lose control of the Merchants Bridge also. In 2018 work began on an extensive renovation of the bridge projected to cost $172 million. In September 2022 the Terminal Railroad completed the large reconstruction project, doubling the bridge's capacty from roughly 32 trains per day to 70 trains per day. Prior to the reconstruction, only one train, traveling at 5 miles per hour, could cross the bridge at a time. The final cost of the project was $222 million.
<kilometre> 0.758952
xsd:nonNegativeInteger 4139
xsd:string Freight and passenger traffic
xsd:string Union Pacific,BNSF,Amtrak
xsd:double 758.952
xsd:double 158.496
xsd:gYear 1889
xsd:nonNegativeInteger 70
<Geometry> POINT(-90.186111450195 38.67472076416)

data from the linked data cloud