Martin Olav Sabo Bridge

http://dbpedia.org/resource/Martin_Olav_Sabo_Bridge an entity of type: Thing

The Martin Olav Sabo Bridge is a bridge in the city of Minneapolis and the first cable-stayed suspension bridge in the U.S. state of Minnesota. Formerly the Midtown Greenway Pedestrian Bridge, it was renamed in honor of former Representative Martin Olav Sabo, a fourteen-term member of Congress from Minnesota. The bridge was built by Hennepin County and transferred to the City of Minneapolis, which owns and maintains the bridge. rdf:langString
rdf:langString Martin Olav Sabo Bridge
rdf:langString Martin Olav Sabo Bridge
xsd:float 44.9547004699707
xsd:float -93.24250030517578
xsd:integer 13038388
xsd:integer 1094198112
rdf:langString Martin Olav Sabo Bridge
rdf:langString The Martin Olav Sabo Bridge viewed from the south, from around 28th Street.
rdf:langString Pedestrian and bicycle
rdf:langString Minnesota State Highway 55 and METRO Blue Line
rdf:langString cable-stayed suspension
rdf:langString Martin Olav Sabo Bridge
xsd:gMonthDay --11-08
xsd:string 44.9547 -93.2425
rdf:langString The Martin Olav Sabo Bridge is a bridge in the city of Minneapolis and the first cable-stayed suspension bridge in the U.S. state of Minnesota. Formerly the Midtown Greenway Pedestrian Bridge, it was renamed in honor of former Representative Martin Olav Sabo, a fourteen-term member of Congress from Minnesota. Opened and dedicated in November 2007, the bridge crosses Hiawatha Avenue (Trunk Highway 55) north of 28th Street East and just south of 26th Street East, joining Phase 2 and Phase 3 of the Minneapolis Midtown Greenway at Hiawatha Avenue, allowing a continuous biking connection across the city. The bridge also links Longfellow community (Longfellow and Seward neighborhoods) to Phillips community (East Phillips neighborhood), and connects users to the north-south Hiawatha LRT Trail and Little Earth Trail. The bridge was built by Hennepin County and transferred to the City of Minneapolis, which owns and maintains the bridge. The bridge was closed on February 20, 2012 when two of the cables that support the bridge fell due to cracks in their attachment points; additional significant cracks were subsequently found in two other support plates. The bridge, supported with temporary bracing, was reopened June 1, 2012. A summary report of the failure analysis released June 8, 2012 determined that unaccounted for wind-induced cable vibrations led to the failures of the attachment points. The bridge was again closed for repairs on September 23, 2012. Repairs were completed, and the bridge reopened, on November 19, 2012.
<kilometre> 0.67056
xsd:nonNegativeInteger 12002
xsd:string Pedestrian and bicycle
xsd:double 30.48
xsd:double 670.5599999999999
xsd:double 67.056
xsd:date 2007-11-08
xsd:gYear 2007
<Geometry> POINT(-93.242500305176 44.954700469971)

data from the linked data cloud