Ma and Pa Trail

http://dbpedia.org/resource/Ma_and_Pa_Trail an entity of type: SpatialThing

The Ma and Pa Trail is a 6.25-mile (10.1 km) multi-purpose rail trail that follows the path of the old Ma and Pa Railroad through Harford County, Maryland. It contains three linked trails, one unconnected, with plans to bridge the gap in the middle, bringing the total length to 10 miles (16 km). Both links of the trail have a variety of trail surfaces (paved, larger gravel, finer gravel), have few steep hills or hazards, and contain overlooks and bridges when necessary. rdf:langString
rdf:langString Ma and Pa Trail
rdf:langString Ma and Pa Trail
xsd:float 39.53394317626953
xsd:float -76.36391448974609
xsd:integer 8593830
xsd:integer 1114711904
rdf:langString Friends Park, Melrose Lane
rdf:langString Williams Street, Equestrian Center
xsd:double 6.25
rdf:langString All year
rdf:langString Heavenly Waters Park, Friends Park, Bel Air
rdf:langString Hiking, bicycling, horseback riding
xsd:string 39.533944444444444 -76.36391111111111
rdf:langString The Ma and Pa Trail is a 6.25-mile (10.1 km) multi-purpose rail trail that follows the path of the old Ma and Pa Railroad through Harford County, Maryland. It contains three linked trails, one unconnected, with plans to bridge the gap in the middle, bringing the total length to 10 miles (16 km). Both links of the trail have a variety of trail surfaces (paved, larger gravel, finer gravel), have few steep hills or hazards, and contain overlooks and bridges when necessary. The Bel Air Trail is a 2.5-mile (4.0 km) trail that runs from Williams Street in downtown to the Equestrian Center on the other side of the bypass. It passes underneath of the Maryland Route 24 (MD 24) highway, the U.S. Route 1 (US 1) bypass, and crosses Tollgate Road, where it meets the Fallston Trail. Spurs off of it connect to the Harford Mall and Liriodendron mansion, and branches out to a dog park at the end. It serves as a shortcut across town, rather than walking along highways, and contains several bridges across branches of the creek while cutting through the forested Heavenly Waters Park. Bathrooms and parking are available at each end of the trail. Horses and dogs are permitted on the Bel Air link of the path. The Fallston Link is a 2-mile (3.2 km) segment dedicated on June 7, 2008, that runs from the Equestrian Center to the Edgeley Grove Farm area of Fallston. The Forest Hill Trail is a third, 1.75-mile (2.8 km) link of the trail running from the duckpond at Friends Park to Melrose Lane. A tunnel is located at MD 23, but passes over a development street on the north end. Bathrooms and parking are located at each end. Dogs are allowed on the Forest Hill link, but horses are not. As of late 2020, final preparations for construction to link the two routes into one continuous trail is underway. At the time of the original constructions, a tunnel was built underneath of US 1 in preparation, but it is unconnected to any path system. Construction for an extension from Bel Air to the Edgeley Grove area in Fallston is planned, and a 4.1-mile (6.6 km) northern link at Dooley Road, near the state line in Cardiff is under study.
rdf:langString Easy
rdf:langString Grade Shifts, Tunnels
xsd:nonNegativeInteger 3675
<Geometry> POINT(-76.363914489746 39.53394317627)

data from the linked data cloud