Line 9 (Mumbai Metro)
http://dbpedia.org/resource/Line_9_(Mumbai_Metro) an entity of type: Thing
Red Line 9 (extension) of the Mumbai Metro is part of the metro system for the city of Mumbai, India. Metro Line 9 is an extension of the Red Line from Andheri to CSMIA and Dahisar to Mira Road. This line will be unique from the other metro lines because it will run on a double-decker bridge. There will be a flyover on the first deck and the metro will run on the second deck. The flyover will start near the proposed Shivaji Chowk (Mira Road) metro station and will end in Bhayander (West) via Mira Bhayander Road. It shall provide interconnectivity among the Western Express Highway, the Western Line, and the Mumbai Metro (Line 2 and Line 7).
rdf:langString
rdf:langString
Line 9 (Mumbai Metro)
rdf:langString
40px|link=Mumbai MetroMumbai Metro Red Line 9
xsd:integer
40
xsd:integer
53664839
xsd:integer
1108611694
xsd:integer
12
rdf:langString
ff0000
xsd:integer
25
rdf:langString
Mira-Bhayander
rdf:langString
Western Suburbs, Mumbai, Maharashtra, India
rdf:langString
collapsed
rdf:langString
MMRDA
rdf:langString
Dahisar
rdf:langString
Under Construction
rdf:langString
Red Line 9 (extension) of the Mumbai Metro is part of the metro system for the city of Mumbai, India. Metro Line 9 is an extension of the Red Line from Andheri to CSMIA and Dahisar to Mira Road. This line will be unique from the other metro lines because it will run on a double-decker bridge. There will be a flyover on the first deck and the metro will run on the second deck. The flyover will start near the proposed Shivaji Chowk (Mira Road) metro station and will end in Bhayander (West) via Mira Bhayander Road. It shall provide interconnectivity among the Western Express Highway, the Western Line, and the Mumbai Metro (Line 2 and Line 7). J Kumar Infraprojects Ltd. has received a Letter of Acceptance (LoA) from Mumbai Metropolitan Region Development Authority (MMRDA) for the design and construction of Mumbai Metro Line 9. A maintenance depot has been proposed at Mira-Bhayandar (main depot for entire Red line). The depot is proposed behind Netaji Subhash Chandra Bose Stadium. This will be one of the biggest metro depots of Mumbai. Total land area proposed for maintenance facilities is 20.0 Ha. It will be an 11.386 km line with an expected ridership of 8.47 lakh (847,000) commuters per day by 2021 and 11.12 lakh (1.112 million) commuters by 2031.
rdf:langString
Elevated, Underground
xsd:integer
9
xsd:nonNegativeInteger
12
xsd:nonNegativeInteger
17447
xsd:string
Under Construction