Line 4 (Mumbai Metro)

http://dbpedia.org/resource/Line_4_(Mumbai_Metro) an entity of type: Thing

Green Line 4 of the Mumbai Metro, currently under construction, is part of the metro system for the city of Mumbai, India and is being developed by MMRDA and a consortium of international companies. The 32.32 km (20.08 mi) line is planned to be fully elevated, and is expected to consist of 32 stations from Wadala (Mumbai) to Kasarvadavali (Ghodbunder road, Thane) via Ghatkopar, Mulund and Teen Hath Naka, a popular traffic crossing in Thane. It is estimated to cost ₹14,549 crore. Its construction was expected to begin by June 2018. rdf:langString
rdf:langString Line 4 (Mumbai Metro)
rdf:langString 40px|link=Mumbai MetroMumbai Metro Green Line 4
xsd:integer 40
xsd:integer 53163770
xsd:integer 1120303279
xsd:integer 90
xsd:integer 32
xsd:integer 8000
xsd:double 3.2
xsd:double 3.9
rdf:langString Mumbai and Thane, Maharashtra, India
rdf:langString collapsed
rdf:langString Gaimukh and Kasarvadavali
xsd:integer 2
rdf:langString Green Line 4 of the Mumbai Metro, currently under construction, is part of the metro system for the city of Mumbai, India and is being developed by MMRDA and a consortium of international companies. The 32.32 km (20.08 mi) line is planned to be fully elevated, and is expected to consist of 32 stations from Wadala (Mumbai) to Kasarvadavali (Ghodbunder road, Thane) via Ghatkopar, Mulund and Teen Hath Naka, a popular traffic crossing in Thane. It is estimated to cost ₹14,549 crore. Its construction was expected to begin by June 2018. It is expected to be completed in 2022 and is expected to provide interconnectivity among the existing Eastern Express Highway, Central Railway, Mono Rail, the ongoing Metro Line 2B (D N Nagar to Mandale), and the proposed Metro Line 5 (Thane to Kalyan), Metro Line 6 (Swami Samarth Nagar to Vikhroli) and Metro Line 11 (Wadala to CSMT). It will provide rail based access to the commercial, government bodies and geographical landmarks in Mumbai. Dedicated depots are planned in Owale land in up to an extent of 20 ha. and in Godrej Land in up to 15.50 ha. area. It will reduce the current travel time by between 50% and 75% depending on road conditions. Alstom awarded to provide rolling stock for this line, but the contract has been cancelled in March 2022 due to delays and uncertainties of the project.
rdf:langString Elevated
rdf:langString Godrej
rdf:langString Owale
<kilometre> 2.7 32.32
xsd:integer 4
xsd:double 2700.0 32320.0
xsd:nonNegativeInteger 32
xsd:double 90.0
xsd:nonNegativeInteger 36661
xsd:double 0.97536 3.9