Line 2 (Mumbai Metro)

http://dbpedia.org/resource/Line_2_(Mumbai_Metro) an entity of type: Thing

The Yellow Line 2 of the Mumbai Metro is the second metro line in the city of Mumbai connecting Dahisar in the northwest with Mandale in Mankhurd in the east. Phase One of Line 2A was partially opened on 2nd April 2022. Construction on the first section of the line, called Metro 2A (between Dahisar and D.N. Road), began in November 2016, and is expected to be completed in May 2021. This section shall be 18.589 km (11.551 mi) long, and comprise 17 of the 39 stations that form part of this route. rdf:langString
rdf:langString Line 2 (Mumbai Metro)
rdf:langString Mumbai Metro Yellow Line 2
rdf:langString Mumbai Metro Yellow Line 2
xsd:integer 43059048
xsd:integer 1124845559
xsd:integer 37
xsd:integer 20
rdf:langString Mumbai Metro Yellow Line 2
xsd:integer 25
rdf:langString Mandale, Mankhurd
rdf:langString MMRDA_Logo.jpg
xsd:integer 150
rdf:langString collapsed
xsd:integer 2023
xsd:integer 2
rdf:langString The Yellow Line 2 of the Mumbai Metro is the second metro line in the city of Mumbai connecting Dahisar in the northwest with Mandale in Mankhurd in the east. Phase One of Line 2A was partially opened on 2nd April 2022. Construction on the first section of the line, called Metro 2A (between Dahisar and D.N. Road), began in November 2016, and is expected to be completed in May 2021. This section shall be 18.589 km (11.551 mi) long, and comprise 17 of the 39 stations that form part of this route.
rdf:langString Elevated
xsd:integer 1610000
rdf:langString Charkop
rdf:langString Mandale
xsd:double 42.232
xsd:double 42232.0
xsd:nonNegativeInteger 37
xsd:nonNegativeInteger 57114
xsd:gYear 2023

data from the linked data cloud