Line 12 (Mumbai Metro)
http://dbpedia.org/resource/Line_12_(Mumbai_Metro) an entity of type: Thing
Orange Line 12 (Extension), or the Kalyan-Dombivli-Taloja Line is a proposed line of Mumbai Metro. It will be an extension of Orange Line. The total length of the line is planned to be 20.75 kilometres (12.89 mi), and the route will be completely elevated. The total cost of the construction is planned to be Rs 4,132 crore. MMRDA approved the Kalyan-Dombivli-Taloja Metro line. There will be 18 stations. This line will connect Navi Mumbai city with Kalyan-Dombivali city.
rdf:langString
rdf:langString
Line 12 (Mumbai Metro)
rdf:langString
Mumbai Metro Orange Line 12 Extension
rdf:langString
Mumbai Metro Orange Line 12 Extension
xsd:integer
59143629
xsd:integer
1107858058
xsd:integer
18
rdf:langString
ffa500
rdf:langString
Navi Mumbai and Thane, Maharashtra, India
rdf:langString
collapsed
rdf:langString
Approved
xsd:integer
2
rdf:langString
Metro
rdf:langString
Orange Line 12 (Extension), or the Kalyan-Dombivli-Taloja Line is a proposed line of Mumbai Metro. It will be an extension of Orange Line. The total length of the line is planned to be 20.75 kilometres (12.89 mi), and the route will be completely elevated. The total cost of the construction is planned to be Rs 4,132 crore. MMRDA approved the Kalyan-Dombivli-Taloja Metro line. There will be 18 stations. This line will connect Navi Mumbai city with Kalyan-Dombivali city. Delhi Metro authority show red flag to Kalyan-Dombivli-Taloja Metro line.However the construction work started on 01/11/2019 and is expected to be completed on 31/10/2024 with Revenue Opening Date (ROD) as 01/11/2024.MMRDA in its 138th Authority Meeting held on 26/08/2015 vide Resolution No. 1340 has granted In-principle Approval to develop growth Centre in Kalyan Taluka (area approx. 1089 Ha.) through implementation of Town Planning Schemes (TPS).
rdf:langString
Elevated
xsd:double
20.75
xsd:integer
12
xsd:double
20750.0
xsd:nonNegativeInteger
18
xsd:nonNegativeInteger
5775
xsd:string
Approved