Lauingen Energy Park
http://dbpedia.org/resource/Lauingen_Energy_Park an entity of type: Thing
勞因根光伏发电站位于德国巴伐利亚州,占地面积63公顷,装机功率达到25.7兆瓦,于2010年7月竣工。 该项目分为三期工程,分别是:The project was built in three phases:
* Helmeringen 1 功率:10.0 MW(于2009年投入使用)
* Helmeringen 2 功率:9.4 MW
* Helmeringen 3 功率:6.3 MW(于2010年投入使用)
rdf:langString
The Lauingen Energy Park is a 25.7–megawatt (MW) photovoltaic power station, located in Bavarian Swabia, Germany. It covers an area of 63 hectares (155.7 acres) and was commissioned in June 2010. The project was built in three phases:
* The 10.0 MW Helmeringen 1 (already commissioned in 2009)
* The 9.4 MW Helmeringen 2
* The 6.3 MW Helmeringen 3 (built and commissioned in 2010) The largest solar power station in Swabia was built by the German company Gehrlicher Solar and features the following key figures:
rdf:langString
rdf:langString
Lauingen Energy Park
rdf:langString
勞因根光伏發電站
rdf:langString
Lauingen Energy Park
rdf:langString
Lauingen Energy Park
xsd:float
48.53694534301758
xsd:float
10.42416667938232
xsd:integer
35352555
xsd:integer
1101107693
rdf:langString
PV
rdf:langString
Germany
rdf:langString
solar park
rdf:langString
Lauingen Energy Park
rdf:langString
O
rdf:langString
June 2010
xsd:string
48.536944444444444 10.424166666666666
rdf:langString
The Lauingen Energy Park is a 25.7–megawatt (MW) photovoltaic power station, located in Bavarian Swabia, Germany. It covers an area of 63 hectares (155.7 acres) and was commissioned in June 2010. The project was built in three phases:
* The 10.0 MW Helmeringen 1 (already commissioned in 2009)
* The 9.4 MW Helmeringen 2
* The 6.3 MW Helmeringen 3 (built and commissioned in 2010) The largest solar power station in Swabia was built by the German company Gehrlicher Solar and features the following key figures:
* 288,132 thin-film modules using cadmium telluride photovoltaics (CdTe PV) manufactured by U.S. company First Solar
* 17,952 conventional solar panels based using crystalline silicon photovoltaics manufactured by Chinese company Yingli
* 18 SMA solar inverters
* 3 Siemens central inverters
* a total of 664 km solar cable trays
* a projected generation of almost 27 million kilowatt-hours (kWh)
* an avoided 14,353 tons of CO2 per year
* powers about 7,500 average households with clean energy, where average means a three-person household with an annual electricity consumption of 3,500 kWh.
rdf:langString
勞因根光伏发电站位于德国巴伐利亚州,占地面积63公顷,装机功率达到25.7兆瓦,于2010年7月竣工。 该项目分为三期工程,分别是:The project was built in three phases:
* Helmeringen 1 功率:10.0 MW(于2009年投入使用)
* Helmeringen 2 功率:9.4 MW
* Helmeringen 3 功率:6.3 MW(于2010年投入使用)
xsd:integer
2008
<gigawattHour>
26.98
<perCent>
12.0
<megawatt>
25.7
xsd:integer
306084
rdf:langString
xsd:gYear
2008
xsd:float
12.0
xsd:nonNegativeInteger
3330
xsd:string
2008
xsd:gYear
2010
xsd:string
O
xsd:double
97128000000000.0
xsd:double
25700000.0
<Geometry>
POINT(10.424166679382 48.536945343018)