Lake Tuz Natural Gas Storage

http://dbpedia.org/resource/Lake_Tuz_Natural_Gas_Storage

Lake Tuz Natural Gas Storage (Turkish: Tuz Gölü Doğalgaz Deposu) is an underground natural gas storage facility under construction in Aksaray Province, central Turkey. It was developed artificially in a salt formation. The storage ensures supply safety in accordance with hourly, daily and seasonal needs. It eliminates supply-demand disparity. Stored natural gas will be withdrawn in times of extreme cold weather or when the water level in the dams are reduced in drought. It also helps price stability. Currently the storage is extended as a next project step. rdf:langString
rdf:langString Lake Tuz Natural Gas Storage
xsd:integer 53567687
xsd:integer 1065757398
rdf:langString Lake Tuz Natural Gas Storage (Turkish: Tuz Gölü Doğalgaz Deposu) is an underground natural gas storage facility under construction in Aksaray Province, central Turkey. It was developed artificially in a salt formation. The storage facility is situated near Sultanhanı town in Aksaray Province 40 km (25 mi) south of Lake Tuz at a depth of 1,100 to 1,400 m (3,600 to 4,600 ft). It was established by creating salt caverns. The twelve man-made salt caverns each with a volume of 630,000–750,000 m3 (22,000,000–26,000,000 cu ft) can hold 1,200,000,000 m3 (4.2×1010 cu ft) natural gas. Daily delivery from the storage can be up to 44,000,000 m3 (1.6×109 cu ft) when needed. The geological structure of the area is suitable for large underground natural gas storage facilities. The salt formation covers an area of 30 km2 (12 sq mi). It is 15 km (9.3 mi) long and around 2.0–2.5 km (1.2–1.6 mi) thick. It has a salt dome structure. To create the caverns in the salt formation, fresh water was brought by pipeline from Hirfanlı Dam at 120 km (75 mi) distance. Using the process of solution mining, water was injected through a borehole into the salt formation, and the saline water, which is formed after dissolution of salt in water, was pumped back to the surface leaving a void in the formation. The salt water was transported to 40 km (25 mi) far away Lake Tuz by pipeline. Gas pressure inside the storage is nearly 210 bar (21,000 kPa). The contract for the project was signed between the Turkish BOTAŞ and the Chinese Tianchen Engineering Company (TCC) in 2012, and the construction started in 2013. For the financing, World Bank provided a loan in amount US$325 million in 2006. Another loan in amount of US$400 million was secured in 2014. The first phase of the storage construction completed in February 2017. It is expected that storage will be fully in service in 2021. When completed, the facility will be capable of storing 10% of the natural gas consumed. Planned goal for total capacity is set to 20% of the consumed natural gas. The cost of the development was US$700 million. The storage ensures supply safety in accordance with hourly, daily and seasonal needs. It eliminates supply-demand disparity. Stored natural gas will be withdrawn in times of extreme cold weather or when the water level in the dams are reduced in drought. It also helps price stability. Currently the storage is extended as a next project step.
xsd:nonNegativeInteger 5377

data from the linked data cloud