Kolkata Metro Line 1
http://dbpedia.org/resource/Kolkata_Metro_Line_1 an entity of type: Thing
The Line 1, Blue Line, also known as North–South Metro of the Kolkata Metro, is a rapid transit system serving South 24 Parganas, Kolkata and North 24 Parganas in Indian state of West Bengal. It consists of 26 operational stations from Dakshineswar to Kavi Subhash, of which 9 are elevated, 2 are at grade and the remaining 15 are underground with a total distance of 31.3 km. The line connects Dakshineswar and New Garia and uses 5 ft 6 in (1,676 mm) 5 ft 6 in (1,676 mm) broad gauge rolling stock. Dakshineswar was opened on 22 February 2021 and is elevated and is located 4.1 km (2.5 mi) north of Noapara . It was the first underground railway to be built in India, with the first operations commencing in October 1984 and the full stretch that was initially planned being operational by February
rdf:langString
rdf:langString
Kolkata Metro Line 1
rdf:langString
100px
xsd:integer
100
xsd:integer
32189433
xsd:integer
1123150509
rdf:langString
Indian Railways signalling system
xsd:integer
26
rdf:langString
Integral Coach Factory and CRRC Dalian
rdf:langString
broad gauge
rdf:langString
Kolkata Metro rake at Masterda Surya Sen metro station in Line 1.
rdf:langString
b82880
xsd:integer
290
rdf:langString
Kolkata Metropolitan Area, India
rdf:langString
collapsed
xsd:date
1984-10-24
rdf:langString
Metro Railway, Kolkata Indian Railways
rdf:langString
Metro Railway, Kolkata
rdf:langString
Operational
xsd:integer
2
rdf:langString
The Line 1, Blue Line, also known as North–South Metro of the Kolkata Metro, is a rapid transit system serving South 24 Parganas, Kolkata and North 24 Parganas in Indian state of West Bengal. It consists of 26 operational stations from Dakshineswar to Kavi Subhash, of which 9 are elevated, 2 are at grade and the remaining 15 are underground with a total distance of 31.3 km. The line connects Dakshineswar and New Garia and uses 5 ft 6 in (1,676 mm) 5 ft 6 in (1,676 mm) broad gauge rolling stock. Dakshineswar was opened on 22 February 2021 and is elevated and is located 4.1 km (2.5 mi) north of Noapara . It was the first underground railway to be built in India, with the first operations commencing in October 1984 and the full stretch that was initially planned being operational by February 1995. On 28 December 2010, it became the 17th zone of the Indian Railways. Being the country's first, and a completely indigenous process, the construction of the Kolkata Metro was more of a trial-and-error affair, in contrast to the Delhi Metro, which has seen the involvement of numerous international consultants. As a result, it took nearly 23 years to completely construct around 15 km underground railway from Birpara up to Tollygunge Metro Station. Public transport experts have suggested that the line be extended from Dakshineswar to Bally (where it can connect with local trains of the Howrah division of Eastern Railway) and eventually to Dankuni, an emerging industrial city.
rdf:langString
rdf:langString
Elevated – 9
rdf:langString
Surface – 2
rdf:langString
Underground – 15
xsd:integer
600000
rdf:langString
Noapara, Tollygunge and New Garia
rdf:langString
Dakshineswar
xsd:integer
380000
xsd:double
32250.0
xsd:nonNegativeInteger
26
xsd:nonNegativeInteger
26238
xsd:date
1984-10-24
xsd:gYear
1984
xsd:string
Operational