Kolkata Metro Line 1

http://dbpedia.org/resource/Kolkata_Metro_Line_1 an entity of type: Thing

The Line 1, Blue Line, also known as North–South Metro of the Kolkata Metro, is a rapid transit system serving South 24 Parganas, Kolkata and North 24 Parganas in Indian state of West Bengal. It consists of 26 operational stations from Dakshineswar to Kavi Subhash, of which 9 are elevated, 2 are at grade and the remaining 15 are underground with a total distance of 31.3 km. The line connects Dakshineswar and New Garia and uses 5 ft 6 in (1,676 mm) 5 ft 6 in (1,676 mm) broad gauge rolling stock. Dakshineswar was opened on 22 February 2021 and is elevated and is located 4.1 km (2.5 mi) north of Noapara . It was the first underground railway to be built in India, with the first operations commencing in October 1984 and the full stretch that was initially planned being operational by February rdf:langString
rdf:langString Kolkata Metro Line 1
rdf:langString 100px
xsd:integer 100
xsd:integer 32189433
xsd:integer 1123150509
rdf:langString Indian Railways signalling system
xsd:integer 26
rdf:langString Integral Coach Factory and CRRC Dalian
rdf:langString broad gauge
rdf:langString Kolkata Metro rake at Masterda Surya Sen metro station in Line 1.
rdf:langString b82880
xsd:integer 290
rdf:langString Kolkata Metropolitan Area, India
rdf:langString collapsed
xsd:date 1984-10-24
rdf:langString Metro Railway, Kolkata Indian Railways
rdf:langString Metro Railway, Kolkata
rdf:langString Operational
xsd:integer 2
rdf:langString The Line 1, Blue Line, also known as North–South Metro of the Kolkata Metro, is a rapid transit system serving South 24 Parganas, Kolkata and North 24 Parganas in Indian state of West Bengal. It consists of 26 operational stations from Dakshineswar to Kavi Subhash, of which 9 are elevated, 2 are at grade and the remaining 15 are underground with a total distance of 31.3 km. The line connects Dakshineswar and New Garia and uses 5 ft 6 in (1,676 mm) 5 ft 6 in (1,676 mm) broad gauge rolling stock. Dakshineswar was opened on 22 February 2021 and is elevated and is located 4.1 km (2.5 mi) north of Noapara . It was the first underground railway to be built in India, with the first operations commencing in October 1984 and the full stretch that was initially planned being operational by February 1995. On 28 December 2010, it became the 17th zone of the Indian Railways. Being the country's first, and a completely indigenous process, the construction of the Kolkata Metro was more of a trial-and-error affair, in contrast to the Delhi Metro, which has seen the involvement of numerous international consultants. As a result, it took nearly 23 years to completely construct around 15 km underground railway from Birpara up to Tollygunge Metro Station. Public transport experts have suggested that the line be extended from Dakshineswar to Bally (where it can connect with local trains of the Howrah division of Eastern Railway) and eventually to Dankuni, an emerging industrial city.
rdf:langString
rdf:langString Elevated – 9
rdf:langString Surface – 2
rdf:langString Underground – 15
xsd:integer 600000
rdf:langString Noapara, Tollygunge and New Garia
rdf:langString Dakshineswar
xsd:integer 380000
xsd:double 32250.0
xsd:nonNegativeInteger 26
xsd:nonNegativeInteger 26238
xsd:date 1984-10-24
xsd:gYear 1984
xsd:string Operational