Kinrara BK 5 LRT station

http://dbpedia.org/resource/Kinrara_BK_5_LRT_station an entity of type: Thing

キンララBK5駅(マレー語:Stesen Kinrara BK 5)は、マレーシアセランゴール州プチョンにある、ラピドKLの駅。駅番号は「SP22」。 rdf:langString
Kinrara BK5 LRT station is a Light Rapid Transit station in Bandar Kinrara, Puchong, Petaling District, Selangor, Malaysia. It was the southern terminus for passenger services on the LRT Extension Project Phase 1. It is operated under Sri Petaling Line network as found in the station signage. Like most other LRT stations operating in Klang Valley, this station is elevated. The LEP Phase 2 covering the remaining stations have commenced operations on 30 June 2016. rdf:langString
rdf:langString Kinrara BK 5 LRT station
rdf:langString キンララBK5駅
rdf:langString Kinrara BK 5
rdf:langString Kinrara BK 5
xsd:float 3.050555467605591
xsd:float 101.6442184448242
xsd:integer 48188731
xsd:integer 1109174845
xsd:integer 47180
rdf:langString Bandar Kinrara 2
rdf:langString Station signage of the station.
xsd:date 2015-10-31
rdf:langString Prasarana Malaysia; operated by Rapid Rail.
rdf:langString Available with payment. 176 total parking bays.
xsd:integer 2
rdf:langString Elevated
rdf:langString Rapid KL
rdf:langString Sri Petaling
xsd:integer 2
xsd:string 3.0505555555555555 101.64422222222223
rdf:langString Kinrara BK5 LRT station is a Light Rapid Transit station in Bandar Kinrara, Puchong, Petaling District, Selangor, Malaysia. It was the southern terminus for passenger services on the LRT Extension Project Phase 1. It is operated under Sri Petaling Line network as found in the station signage. Like most other LRT stations operating in Klang Valley, this station is elevated. The work of LRT Extension Project (LEP) that was kicked off in the middle of 2013 started from Awan Besar and passes through Kinrara, Puchong, and ended at Putra Heights. The extension is 17.7 km long with 11 new stations and was completed in stages. The first stage of 4 stations was completed in September 2015 and commenced operations on 31 October 2015. The LEP Phase 2 covering the remaining stations have commenced operations on 30 June 2016.
rdf:langString キンララBK5駅(マレー語:Stesen Kinrara BK 5)は、マレーシアセランゴール州プチョンにある、ラピドKLの駅。駅番号は「SP22」。
xsd:nonNegativeInteger 3042
rdf:langString Bukit Jalil Highway
rdf:langString Bandar Kinrara 2
rdf:langString 47180,Puchong,Selangor
xsd:nonNegativeInteger 2
xsd:date 2015-10-31
xsd:gYear 2015
xsd:string Available with payment. 176 total parking bays.
xsd:string 2side platforms
xsd:string Elevated
<Geometry> POINT(101.64421844482 3.0505554676056)