Jarlsberg Tunnel

http://dbpedia.org/resource/Jarlsberg_Tunnel an entity of type: Thing

The Jarlsberg Tunnel (Norwegian: Jarlsbergtunnelen) is a 1,750-meter (5,740 ft) long double track railway tunnel which runs through Frodeåsen in Tønsberg, Norway. Located on the Vestfold Line, the tunnel was built as part of the 7.8-kilometer (4.8 mi) double-track high-speed segment from Barkåker to Tønsberg. It is located just north of Tønsberg Station and runs between Frodegata and Tomsbakken. Most of the tunnel is blasted, although 223 meters (732 ft) is in a concrete culvert. Planning of the tunnel started in the late 1990s. Several railway interest groups advised against building the isolated segment of upgraded track without a complete plan for upgrading the entire line. Construction started in April 2009 and the new section and the tunnel opened on 7 November 2011. It was the fourth rdf:langString
rdf:langString Jarlsberg Tunnel
rdf:langString Jarlsberg Tunnel
rdf:langString Jarlsberg Tunnel
xsd:float 59.28409957885742
xsd:float 10.40610027313232
xsd:integer 35022760
xsd:integer 1094184301
rdf:langString The northern entrance during the late phase of construction, before overhead wire was installed
rdf:langString Frodegata
xsd:date 2011-11-07
rdf:langString Tomsbakken
xsd:string 59.2841 10.4061
rdf:langString The Jarlsberg Tunnel (Norwegian: Jarlsbergtunnelen) is a 1,750-meter (5,740 ft) long double track railway tunnel which runs through Frodeåsen in Tønsberg, Norway. Located on the Vestfold Line, the tunnel was built as part of the 7.8-kilometer (4.8 mi) double-track high-speed segment from Barkåker to Tønsberg. It is located just north of Tønsberg Station and runs between Frodegata and Tomsbakken. Most of the tunnel is blasted, although 223 meters (732 ft) is in a concrete culvert. Planning of the tunnel started in the late 1990s. Several railway interest groups advised against building the isolated segment of upgraded track without a complete plan for upgrading the entire line. Construction started in April 2009 and the new section and the tunnel opened on 7 November 2011. It was the fourth segment of the Vestfold Line to be upgraded.
xsd:double 1750.0
xsd:double 200.0
xsd:nonNegativeInteger 23540
<Geometry> POINT(10.406100273132 59.284099578857)

data from the linked data cloud