HillTopper Wind Farm
http://dbpedia.org/resource/HillTopper_Wind_Farm
The HillTopper Wind Farm is a 74-turbine wind farm near Mount Pulaski in southeastern Logan County in the U.S. state of Illinois. The turbines were designed to generate a maximum of 185 megawatts of electricity. The complex was completed by Enel Green Power at a cost of approximately $325 million, and entered operations in 2018.
rdf:langString
rdf:langString
HillTopper Wind Farm
xsd:integer
72093613
xsd:integer
1119479863
rdf:langString
The HillTopper Wind Farm is a 74-turbine wind farm near Mount Pulaski in southeastern Logan County in the U.S. state of Illinois. The turbines were designed to generate a maximum of 185 megawatts of electricity. The complex was completed by Enel Green Power at a cost of approximately $325 million, and entered operations in 2018.
xsd:nonNegativeInteger
1867