Green Line (Tel Aviv Light Rail)

http://dbpedia.org/resource/Green_Line_(Tel_Aviv_Light_Rail) an entity of type: Thing

The Green Line is the proposed second section of a light rail system the Tel Aviv metropolitan area, known as Tel Aviv Light Rail. The line will run from Rishon LeZion northwards through Holon through central Tel Aviv and will split into two branches: One to Herzliya in the north, and one to Ramat HaHayal neighborhood in Tel Aviv in the northeast. The expected annual passenger forecast is 65 million. rdf:langString
rdf:langString Green Line (Tel Aviv Light Rail)
rdf:langString Green Line
rdf:langString Green Line
xsd:integer 43006828
xsd:integer 1112238850
xsd:integer 58
xsd:integer 1500
rdf:langString Dankal Logo.svg
xsd:integer 150
rdf:langString show
rdf:langString NTA
xsd:integer 2
rdf:langString Underground
rdf:langString in Street Level
rdf:langString Under construction
rdf:langString Tel Aviv Light Rail
rdf:langString Light rail
rdf:langString The Green Line is the proposed second section of a light rail system the Tel Aviv metropolitan area, known as Tel Aviv Light Rail. The line will run from Rishon LeZion northwards through Holon through central Tel Aviv and will split into two branches: One to Herzliya in the north, and one to Ramat HaHayal neighborhood in Tel Aviv in the northeast. The expected annual passenger forecast is 65 million. NTA is including the design and boring of the Green Line's tunnels as part of Red Line's tunnels overall contract so that work on the Green Line's underground portion can commence immediately following the completion of the Red Line tunnels.
xsd:integer 2028
xsd:double 35000.0
xsd:nonNegativeInteger 58
xsd:double 50.0 70.0
xsd:nonNegativeInteger 2841
xsd:string Under construction