Green Line (Namma Metro)
http://dbpedia.org/resource/Green_Line_(Namma_Metro) an entity of type: Thing
Green Line of Namma Metro was built along with the Purple Line during the first phase of construction of the metro rail system for the city of Bengaluru, Karnataka, India. The 30.5 km line connects Nagasandra in the northwest to Silk Institute in the south. The line connects the industrial centers of Peenya and Yelahanka in the north with the central hub of Majestic and the southern residential areas of Bangalore (Basavanagudi, Jayanagar, Banshankari etc.). Green Line is mostly elevated, with 26 elevated stations and 3 underground stations. The Line passes through Majestic station which is an interchange station between Green and Purple Lines.
rdf:langString
rdf:langString
Green Line (Namma Metro)
rdf:langString
Green Line
rdf:langString
Green Line
xsd:integer
26801856
xsd:integer
1124810541
xsd:integer
40
xsd:integer
3
29
rdf:langString
Hyundai Rotem - BEML
rdf:langString
Green Line map
xsd:integer
300
rdf:langString
A Green Line metro train
xsd:integer
750
xsd:integer
300
rdf:langString
Bengaluru, Karnataka, India
xsd:integer
150
rdf:langString
collapsed
xsd:date
2014-03-01
rdf:langString
North - South corridor
rdf:langString
Bengaluru Metro Rail Corporation Limited
rdf:langString
Operational
xsd:integer
2
rdf:langString
Green Line of Namma Metro was built along with the Purple Line during the first phase of construction of the metro rail system for the city of Bengaluru, Karnataka, India. The 30.5 km line connects Nagasandra in the northwest to Silk Institute in the south. The line connects the industrial centers of Peenya and Yelahanka in the north with the central hub of Majestic and the southern residential areas of Bangalore (Basavanagudi, Jayanagar, Banshankari etc.). Green Line is mostly elevated, with 26 elevated stations and 3 underground stations. The Line passes through Majestic station which is an interchange station between Green and Purple Lines. When Phase II is completed, the line will stretch from Madavara in northwest to Silk Institute in the South. The length of the line will increase to 34.46 kilometres (21.41 mi).
rdf:langString
Elevated and underground
xsd:integer
170685
rdf:langString
Peenya
xsd:double
30.69
xsd:integer
62300000
xsd:double
30690.0
xsd:nonNegativeInteger
3
29
xsd:double
40.0
xsd:nonNegativeInteger
30045
xsd:date
2014-03-01
xsd:gYear
2014
xsd:string
Operational