Grand Canyon Railway 29

http://dbpedia.org/resource/Grand_Canyon_Railway_29 an entity of type: Thing

Grand Canyon Railway No. 29 is the sole example of the class "SC-3" 2-8-0 "Consolidation" type steam locomotive. It was built by the American Locomotive Company (ALCO) in Pittsburgh, Pennsylvania in May 1906 for use in hauling carloads of iron ore on branch lines of the Lake Superior and Ishpeming Railroad as engine No. 14, and it was renumbered 29 in 1923. It was retired from revenue service in 1956. In 1963, it was sold to the Marquette and Huron Mountain Railroad, but it never ran there, and it was eventually sold to the Mid-Continent Railway Museum. Today, it resides at the Grand Canyon Railway as a running mate to former Chicago, Burlington and Quincy 2-8-2 No. 4960. As of 2022, though, it is going through a 1,472-day FRA boiler inspection. rdf:langString
rdf:langString Grand Canyon Railway 29
rdf:langString Grand Canyon Railway 29
rdf:langString Grand Canyon Railway 29
xsd:integer 65861801
xsd:integer 1122122415
rdf:langString May 1906
rdf:langString Steam
xsd:integer 1956 1995 2008 2019
xsd:integer 39637
xsd:integer 1
xsd:integer 2
rdf:langString American Locomotive Company
rdf:langString GCRY No. 29 on display at the Grand Canyon depot in Williams, Arizona in 2013
rdf:langString Grand Canyon Railway No. 29 is the sole example of the class "SC-3" 2-8-0 "Consolidation" type steam locomotive. It was built by the American Locomotive Company (ALCO) in Pittsburgh, Pennsylvania in May 1906 for use in hauling carloads of iron ore on branch lines of the Lake Superior and Ishpeming Railroad as engine No. 14, and it was renumbered 29 in 1923. It was retired from revenue service in 1956. In 1963, it was sold to the Marquette and Huron Mountain Railroad, but it never ran there, and it was eventually sold to the Mid-Continent Railway Museum. Today, it resides at the Grand Canyon Railway as a running mate to former Chicago, Burlington and Quincy 2-8-2 No. 4960. As of 2022, though, it is going through a 1,472-day FRA boiler inspection.
rdf:langString SC-3 23/30 48
rdf:langString Two, outside
rdf:langString New:
rdf:langString Now:
rdf:langString Undergoing 1,472-day boiler inspection, based in Williams, Arizona
rdf:langString New:
rdf:langString Now:
rdf:langString Worthington type SA
rdf:langString Vegetable oil:
rdf:langString coal:
rdf:langString New: coal
rdf:langString Now: Vegetable oil
rdf:langString B-4
rdf:langString SC-3
xsd:integer 1925
xsd:integer 2004
xsd:integer 2016
rdf:langString April 1990
xsd:nonNegativeInteger 18335
xsd:gYear 1906
xsd:gYear 1906

data from the linked data cloud