Gordie Howe Bridge (Saskatoon)
http://dbpedia.org/resource/Gordie_Howe_Bridge_(Saskatoon) an entity of type: Thing
The Gordie Howe Bridge is a vehicular freeway bridge that spans the South Saskatchewan River in Saskatoon, Saskatchewan, Canada. It is a steel girder bridge, built as part of the Circle Drive freeway system in southwestern Saskatoon. At the time of construction, it was projected to cost $272.5 million to build. It is the southernmost road bridge in the city. The bridge is located adjacent to the Grand Trunk Bridge. It is also the longest of Saskatoon's bridges at 440 metres (1,440 ft) in length, and the first to have a concrete road surface. The bridge was scheduled to open with the completion of the entire Circle Drive South project on September 30, 2012. However, record rainfall, high water tables and an early snowfall made that deadline unfeasible. The actual completion and opening date
rdf:langString
rdf:langString
Gordie Howe Bridge (Saskatoon)
rdf:langString
Gordie Howe Bridge
xsd:float
52.09749984741211
xsd:float
-106.6952743530273
xsd:integer
29768047
xsd:integer
1087130880
xsd:date
2010-03-29
rdf:langString
Gordie Howe Bridge
rdf:langString
Gordie Howe Bridge
rdf:langString
Graham-Flatiron
rdf:langString
Gordie Howe Bridge
xsd:integer
6
rdf:langString
City of Saskatoon
rdf:langString
Gordie Howe Bridge
xsd:date
2013-07-31
xsd:string
52.0975 -106.69527777777778
rdf:langString
The Gordie Howe Bridge is a vehicular freeway bridge that spans the South Saskatchewan River in Saskatoon, Saskatchewan, Canada. It is a steel girder bridge, built as part of the Circle Drive freeway system in southwestern Saskatoon. At the time of construction, it was projected to cost $272.5 million to build. It is the southernmost road bridge in the city. The bridge is located adjacent to the Grand Trunk Bridge. It is also the longest of Saskatoon's bridges at 440 metres (1,440 ft) in length, and the first to have a concrete road surface. The bridge was scheduled to open with the completion of the entire Circle Drive South project on September 30, 2012. However, record rainfall, high water tables and an early snowfall made that deadline unfeasible. The actual completion and opening date was July 31, 2013.
xsd:integer
6
xsd:nonNegativeInteger
6
<kilometre>
0.44
xsd:nonNegativeInteger
8330
xsd:string
6 lanes ofCircle Drive
xsd:string
March 29, 2010
xsd:double
440.0
xsd:date
2013-07-31
xsd:gYear
2013
<Geometry>
POINT(-106.69527435303 52.097499847412)